I-78 Krumsville Interchange ITS

Posted on December 30th, 2023 by Jillian Taylor

Our team prepared ITS plans for the installation of two DMS and removal, temporary replacement, and relocation of one CCTV Camera, one HAR flashing beacon sign, and one HAR Transmitter. We also completed partial interchange lighting design for the new interchange. 

SR 0061 Pottsville Pike and Tuckerton Road

Posted on December 29th, 2023 by Jillian Taylor

The project started with preliminary engineering for PennDOT District 5-0 in 2010. There were several phases of the project in engineering, including an alternatives analysis, preliminary engineering, environmental clearance, and final design prior to the project advancing into construction.

SR 0415 Memorial Highway, Dallas 5-leg Intersection

Posted on December 28th, 2023 by Jillian Taylor

Our firm was retained by PennDOT for the preliminary engineering and final design of the $3.5M “Dallas 5-Leg” intersection improvement project. This project was identified as a “high priority” project in the Back Mountain Area Council of Government’s Transportation Plan.

Federal Aviation Administration, ATCT Life Safety Assessments

Posted on October 4th, 2023 by Ji Lee

At over 65 locations throughout the eastern United States, our team designed modifications to air traffic control towers’ (ATCT) fire and life safety systems in order to comply with new OSHA standards and FAA criteria.

Aquetong Spring Park Project

Posted on September 29th, 2023 by Jillian Taylor

This project included a 10’ wide bituminous asphalt shared-use path beginning at a proposed parking lot adjacent to the reconfigured Judy House driveway access along Lower Mountain Road. The path extends north along Lower Mountain Road before turning to generally follow Lower York Road (SR 0202) eastbound.

Interstate 78, SR 501 Interchange Improvement

Posted on September 28th, 2023 by Jillian Taylor

Our firm was retained to provide transportation engineering services for this interchange improvement project. Our team had previously completed a Transportation Impact Fee Roadway Sufficiency Analysis and Capital Improvement Plan for Bethel Township.

Walk Phoenixville | Pedestrian Walkability & Accessibility Plan

Posted on September 28th, 2023 by Jillian Taylor

The team conducted a comprehensive evaluation to assess pedestrian accommodations throughout the entire borough. This evaluation led to the development of a pedestrian walkability and accessibility plan to address necessary policy changes, maintenance and operational issues and needed capital improvements.

Groundwater Investigation and Monitoring Plan

Posted on August 25th, 2023 by Jillian Taylor

Bowman prepared a groundwater work plan and implemented a groundwater investigation. The purpose of the investigation was to address the karstic terrain surrounding the 300-acre cement quarry.

Spruce Street Harbor Park

Posted on April 17th, 2023 by Jillian Taylor

Our team provided marine engineering services for the construction of Spruce Street Harbor Park at Penn’s Landing in Philadelphia, PA. We provided mooring analysis, preliminary and final marine structural analysis and design, permitting and construction inspection services for this project.

North Terminal Rehabilitation

Posted on December 7th, 2022 by Jillian Taylor

Our marine engineers performed structural analysis of the bulkhead and designed the required rehabilitation of damaged sections of the dock bulkhead. Scope included performing repair design underwater inspection, developing conceptual alternates for the rehabilitation and developing estimated construction cost of each option.