Lake Shore Drive Viaducts

Posted on September 20th, 2020 by Renee Narvaez

Bowman provided Phase II design services for the replacement of the Lake Shore Drive (US 41) Viaducts over Lawrence Avenue and Wilson Avenue. Both roadways will be reconstructed to provide minimum vertical clearance under US 41 as well as a new typical section to accommodate shared bicycle lanes.

Route 229

Posted on September 20th, 2020 by Renee Narvaez

Bowman provided project management of the right-of-way and easement acquisition efforts and negotiations for 51 parcels to widen Route 229’s existing two-lane roadway to a four-lane roadway and provide curb and gutter, sidewalk, and a 10-foot shared-use path.

Route 460 Corridor Improvement Project

Posted on September 20th, 2020 by Renee Narvaez

This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.

CTC on Ellsworth

Posted on September 18th, 2020 by Renee Narvaez

CTC on Ellsworth features 145 units of two-bedroom and duplex one-bedroom single-story homes with high-end amenities and private backyards. Bowman provided planning, zoning support, entitlements, site planning, preliminary and final engineering, and construction support services.

Whole Foods Rooftop Solar

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets; the height of the parapet off of the roof deck every 20 feet or where vertical changes occurred.

Wheatlands

Posted on September 15th, 2020 by editor@bowman

Bowman provided planning and design services to support a multi-year mixed used area development. The team coordinated the design and submission of multiple interconnected planning packages to construct major public infrastructure and utility projects.

Woodland Road Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

This two phase road reconstruction project involved approximately 6,600 lf of linear frontage. Bowman provided is planning and civil design services to analyze and redesign over a mile of public road infrastructure. The team also designed an expansion of the area to include bike lanes, new sidewalk, and drainage improvements.

XTO to Bluestone Pipeline

Posted on September 15th, 2020 by editor@bowman

Bowman provided pipeline and ROW design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous road and railroad crossings, creeks and wetlands.

Villages of Leesburg

Posted on September 15th, 2020 by editor@bowman

Bowman provided land planning, surveying, and engineering design services for this mixed-use development located in the Town of Leesburg. Modeled after developments such as Reston Town Center, the project includes a Wegmans supermarket, and a town center like central core that will include a variety of supportive restaurant, retail, and office spaces.

Villago

Posted on September 15th, 2020 by editor@bowman

Bowman provided entitlement, design, engineering, and platting services for a 1,709-acre master planned community in Casa Grande, AZ. With the first phase designed and built, Bowman was hired to incorporate revisions to the remaining phases and accommodate adjustments in arterial roadway alignments, and park acreage as required by the City.