Murray Morgan Bridge Rehabilitation

Posted on November 8th, 2024 by Ji Lee

Our engineers played a key role on the design-build team for the federally funded rehabilitation of this historic 1,700-foot-long bridge—a combination concrete girder and steel truss movable structure spanning the Thea Foss Waterway and the BNSF mainline. The project involved extensive structural repairs, including the replacement of the truss bottom chord, gusset plates, steel stringers, […]

Los Angeles County MTA Purple Line Extension

Posted on November 7th, 2024 by Ji Lee

Our team served as Engineer of Record for LA Metro’s Westside Purple Line Extension, designing Century City/Constellation Station and reviewing plans for Wilshire/Rodeo Station. The project demanded advanced soil-structure interaction, 3D modeling, and excavation support to ensure stability beneath densely developed areas along Wilshire Boulevard, factoring in seismic resilience and loading impacts from nearby high-rise buildings in this urban infrastructure initiative.

On-Call GEC for Bus System Infrastructure Improvements

Posted on September 30th, 2024 by Renee Narvaez

Bowman was engaged by the MBTA for a four-year, $7M contract to plan, design and construct a wide range of bus system infrastructure projects to further upgrade and enhance bus system accessibility, safety, state of good repair, service reliability, travel times, and system wide expansion.

North Station to Seaport Bus Link

Posted on September 30th, 2024 by Renee Narvaez

The overarching goal of the North Station to Seaport Bus Link project is to improve transit connectivity across the Downtown core of the City of Boston to meet current and future transit demands.

Crystal Drive Streetscape Improvements

Posted on June 17th, 2024 by Renee Narvaez

As part of several distinct projects along the Crystal Drive corridor, Bowman prepared designs for the construction of streetscape improvements including multi-modal transit accommodations with protected bicycle lanes, urban landscaping, green stormwater infrastructure, street lights and infrastructure improvements.

Blue River Bridge

Posted on March 26th, 2024 by Renee Narvaez

In this urban bridge project spanned the Blue River in Crete, NE. Our team performed the survey, design and construction inspection and administration of two bridges, storm sewer, concrete paving, environmental monitoring, seeding and erosion control.

Hurricane Creek Bridge Replacement

Posted on February 7th, 2024 by Renee Narvaez

Deep in the woods of the Great Pee Dee River Heritage Preserve was a bridge that was on the verge of failure due to high water events, a build of debris, and age. Our team worked with SCDNR to design a solution that would solve many of the site’s issues.

Hill Street Repaving and Improvements

Posted on February 7th, 2024 by Renee Narvaez

Our team has designed and permitted the repaving and improvements of Hill Street from Sumter Ave to Marion Ave located in Fort Jackson, SC. The improvements are intended make the road safer for pedestrians and offer better parking for buildings in the area.

City of Chester Streetscape Rehabilitation

Posted on February 7th, 2024 by Renee Narvaez

Our team was hired by the City of Chester to provide a master plan for rehabilitation work along Main Street and Gadsen Street including replacing trees, resetting pavers, replacing concrete sidewalk and repairing asphalt pavement.

Aiken Chapel Road Realignment

Posted on February 7th, 2024 by Renee Narvaez

Our team designed and permitted the intersection improvements of Aiken Chapel Road at Beeks Road located in Taylors, SC for Greenville County. The intersection improvements are intended to improve traffic flow & stormwater drainage while still providing necessary access to facilities in the area.