Sterling Southeast

Posted on March 26th, 2024 by Renee Narvaez

This 4-span 265’-0” pre-stressed concrete inverted tee girder bridge was constructed over the North Fork Big Nemaha River. Our team performed topographic survey, hydraulic survey, roadway design, bridge design, construction inspection and administration.