Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.
Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.
Design engineering services for sewer improvement projects located throughout Chicago. Work includes data collec-tion and initial assessments, coordination of survey and geotechnical engineering, utility coordination, sewer align-ments and profiles, structural design, compliance with IEPA water sewer separation requirements, cross sec-tions/typical sections, traffic control and detours, surface drainage design, OUC submittals and approvals, and permitting.
Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.