Coconut Point

Posted on September 26th, 2023 by Jillian Taylor

Bowman helped to bring this unique concept of managing urban living with retail shopping to Southwest Florida. Our team provided site/civil engineering, survey, landscape architecture and construction phase services for the project – the largest of its kind in the United States.

James Bland Pocket Park

Posted on September 18th, 2023 by Jillian Taylor

Bowman worked with city staff, community stakeholders and an archaeologist to develop a design that integrates a community gathering space, an active play area for children 2-5 years old, and the history of the site.

Hanover Tysons

Posted on August 31st, 2023 by Renee Narvaez

Bowman provided full-service engineering, environmental consulting, surveying and construction administration for a new seven-story residential building and structured parking deck in Tysons, VA.

Hydrogeologic Investigation

Posted on August 23rd, 2023 by Jillian Taylor

Bowman geologists were responsible for the implementation of a groundwater investigation relative to a proposed quarry deepening. The work consisted of drilling oversight and logging of approximately 1,000 LF of bedrock borings, installation of bedrock piezometers, stream gauging, photolineament analysis, aquifer testing, and geologic mapping.

Visual Impact Analysis

Posted on August 23rd, 2023 by Jillian Taylor

Bowman evaluated visual impacts to Viewshed for Hooper Garnet Mine Expansion. A digital terrain model was used to create expansion footprint. Topographic mapping was used to predict visual impacts. Mitigation measures and reclamation planning were developed to reduce visual impacts to the community.

Pohick Stream Valley Park – Burke Station Trail

Posted on August 23rd, 2023 by Jillian Taylor

Bowman provided planning, engineering, surveying, and environmental consulting services for development of the 2,800 LF of stream valley trail within the surrounding Burke Station Park. Development included design of the eight-ft. wide multipurpose trail, pedestrian bridge crossing, culverts and associated improvements.

St. Martin’s Apartments

Posted on August 23rd, 2023 by Renee Narvaez

This project consists of a four-story, 178-unit, mixed-income apartment complex located in the Eckington area of Washington, DC on a site of approximately 1.6 acres. The historic convent building on the site was moved and is incorporated into the apartment building design, including approximately six rental units, and was built in accordance with historic preservation guidelines.

Ken Lawrence Park: Athletic Fields & Stream Valley Trail

Posted on August 23rd, 2023 by Jillian Taylor

As part of the 2.5 million sq. ft. redevelopment project known as Arbor Row, located within the heart of the new Tyson Urban Center, Bowman provided full service engineering, environmental, surveying and construction administration services for the first two synthetic turf fields in Tysons, VA.

Joint Base Andrews Family Housing

Posted on August 23rd, 2023 by Renee Narvaez

As part of the effort to replace the military’s inventory of obsolete and inadequate housing with safe, comfortable homes for military families, JB Andrews hopes to rehabilitate existing units and provide new units, producing high quality housing for military families.

Dutch Chocolate Shop

Posted on April 14th, 2023 by Christina Nichols

Our 3D laser scanning team used the latest scanning technology to document every facet of the Dutch shop’s ornate interior. The scans were turned into detailed Revit models, which the client used to design around the existing structure.