North Texas Municipal Water District McKinney East Side Water Line

Posted on August 26th, 2022 by Renee Narvaez

Our team completed the aerial and LiDAR survey for a proposed 5 mile water line in McKinney, Texas. We managed the collection of aerial photogrammetry and LiDAR using a helicopter with a single pass and extracted planimetrics and a digital terrain model with one ft contours.

Kilgore Surface Water Treatment Plant

Posted on August 26th, 2022 by Renee Narvaez

Our team completed the design survey for a new high service pump station to replace the existing high service pumping facility at the Kilgore Surface Water Treatment Plant. We set project control throughout the site and utilized their unmanned aerial vehicle (UAV) to survey the existing structures, ground features, and create a point cloud, video, and digital terrain model of the site.

Jonah Water Special Utility District

Posted on August 26th, 2022 by Renee Narvaez

Our team completed the boundary and topographic survey of 10.2 miles for a proposed 24-in waterline from the Circleville Pump Station to the Jonah Special Utility District headquarters located in Williamson County.

Beck Branch Sanitary Sewer Interceptor

Posted on August 4th, 2022 by Renee Narvaez

Our team was hired to perform the design survey of approximately 19,000 LF for the purpose of a new sanitary sewer line in the City of Plano. First we established control points and benchmarks at 1,000-ft intervals. Horizontal coordinates were established using GPS and vertical values were established by conventional leveling.

Ferry Street Improvements

Posted on June 11th, 2022 by Renee Narvaez

A roadway and intersection improvements with a mini roundabout. Included pedestrian, bicycle, and parking improvements using a shared-use path, pedestrian crossings and new parking areas. The design improved the connection to the existing City Rail Trail. The drainage system was upgraded, lighting added, utilities were improved, and landscape and streetscape beautified the area.

Royal Farms Convenience Stores

Posted on October 19th, 2021 by Renee Narvaez

Bowman has been contracted by Royal Farms in providing site/civil engineering for the construction of new convenience stores and gas stations located across Virginia. Bowman has provided due diligence and site layout and design for each of the stores.

Windsor Water System Mapping

Posted on September 28th, 2020 by Renee Narvaez

To convert existing CAD data and hard copy maps of the water distribution system into a GIS framework, Bowman identified the water distribution system features including mains, valves, storage tanks, wells, services, meters, and fire hydrants.

VDOT Safety Rest Area Support Services

Posted on September 15th, 2020 by Renee Narvaez

This project involved the engineering/condition assessment of VDOT’s Safety Rest Areas water and wastewater facilities, totaling 21 different facilities throughout the Commonwealth.

Middlesex Regional Water System

Posted on September 15th, 2020 by Renee Narvaez

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Due to poor groundwater quality in the individual shallow wells throughout the eastern portion of the County, the MWA has sought to develop a regional water system to serve the entire eastern section of the County. This effort […]

Middlesex Water Authority Sewage Collection System

Posted on September 15th, 2020 by Renee Narvaez

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Bowman has completed this evaluation, developed and obtained approval of the Preliminary Engineering Report and has begun design to follow Hampton Roads Planning District Commission specifications. The scope involves the installation of approximately 42 miles of water distribu-tion piping sized from 12” down to 2″.