Project Talon II Admin/Data Center

Posted on September 29th, 2020 by editor@bowman

Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.

Confidential Arizona Data Center

Posted on September 29th, 2020 by Suede

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.

The Havenly at Fountain Hills

Posted on September 24th, 2020 by Renee Narvaez

Bowman’s first Build for Rent project with one- and two-story units, this 16-acre site is located on the rolling hills of Fountain Hills and features 147 units of one-, two- and three-bedroom homes with high-end amenities, a paseo through the middle of the site, and private gathering areas for each unit.

Walgreens

Posted on September 22nd, 2020 by editor@bowman

Bowman has designed more than 20 Walgreen’s stores in Arizona, Maryland, and Virginia. Services provided include complex engineering designs, surveying, due diligence, feasibility studies, zoning and entitlement services, construction drawings, landscape architecture, and construction administration.

Confidential ILS System

Posted on September 21st, 2020 by editor@bowman

Bowman was retained to provide detailed design of concrete footings and steel pipe supports for this Intermediate Leach System (ILS) which includes two pipelines.

Confidential Leach Pad Phase II

Posted on September 21st, 2020 by editor@bowman

Bowman performed value engineering and design optimization for the phase II design of a leach pad in a canyon with aggressive slopes (~2.5H:1V). The design included liner subgrade, geomembrane and GCL, solution collecting pipe network, and overliner drain rock.

Confidential Stockpile Dams

Posted on September 21st, 2020 by editor@bowman

Bowman performed the engineering design and construction quality assurance for multiple stormwater retention dams. The design process included watershed analyses, lithological investigation and interpretation, earthen structure stability analyses, and flow considerations for a 100-year storm event.

Confidential Filter Infrastructure

Posted on September 21st, 2020 by editor@bowman

Bowman provided the concrete slabs, foundations, and anchor designs for new infrastructure for the expansion of the Hydromet area to allow the SX/EW facili-ties to handle increased throughput. This work included the structural design and drawings, identifying civil components such as tops of concrete on footings and slabs, ensuring drainage to the existing drain sump and the addition of a contain-ment curb to improve capture of spills.

Confidential Haul Road Culverts

Posted on September 21st, 2020 by editor@bowman

As a result of a new pit being developed at the mine, a haul road was developed from the pit to the existing crushing facility. Bowman designed six (6) culverts that allow stormwater to flow under the new haul road.

CTC on Ellsworth

Posted on September 18th, 2020 by Renee Narvaez

CTC on Ellsworth features 145 units of two-bedroom and duplex one-bedroom single-story homes with high-end amenities and private backyards. Bowman provided planning, zoning support, entitlements, site planning, preliminary and final engineering, and construction support services.