Internap Colocation Facility
Our team performed fire protection engineering and life safety design, as well as construction period services, as part of the design team. Phase I of the data center’s expansion included converting approximately 17,000 sq. ft. of existing office space in downtown Atlanta to a data center with associated support areas. Per the Internap basis of design, the data center was protected by a preaction sprinkler system.