Sycamore Creek Sanitary Sewer Relief Interceptor, Phase III

Posted on August 29th, 2022 by editor@bowman

Our team completed the design survey of approximately 6,700 LF for the purpose of a new sanitary sewer relief interceptor in the City of Fort Worth. The proposed alignment for this project traversed through a city park, crossed US Highway 287, Sycamore Creek, and public right-of-way.

Rush Creek Flood Study

Posted on August 26th, 2022 by editor@bowman

Our team completed the topographic survey for the Rush Creek Flood Study located along Paul Wilson Road in Collin County, Texas. To begin the project, we received the Collin County 2018 LiDAR data to review and ensure that control and topographic survey data would match the LiDAR data.

North Texas Municipal Water District McKinney East Side Water Line

Posted on August 26th, 2022 by editor@bowman

Our team completed the aerial and LiDAR survey for a proposed 5 mile water line in McKinney, Texas. We managed the collection of aerial photogrammetry and LiDAR using a helicopter with a single pass and extracted planimetrics and a digital terrain model with one ft contours.

Navasota River Boundary Survey

Posted on August 26th, 2022 by editor@bowman

Our team completed a boundary survey of over 1,500 acres consisting of ten individual tracts in Brazos County, as needed by the client for a real estate closing. This project included approximately five miles of boundary along the Navasota River, along the Brazos and Madison County line, and approximately another mile of boundary along the centerline of a creek.

King’s Creek Wind Farm

Posted on August 26th, 2022 by editor@bowman

Kings Creek Wind Farm was a hard bid, multi-phase aerial and ALTA survey for an approximate 50,000 acre wind farm. The scope consisted of a manned aircraft aerial survey to collect ortho imagery and an on-the-ground boundary survey to produce ALTA surveys for all project parcels.

Kilgore Surface Water Treatment Plant

Posted on August 26th, 2022 by editor@bowman

Our team completed the design survey for a new high service pump station to replace the existing high service pumping facility at the Kilgore Surface Water Treatment Plant. We set project control throughout the site and utilized their unmanned aerial vehicle (UAV) to survey the existing structures, ground features, and create a point cloud, video, and digital terrain model of the site.

Jonah Water Special Utility District

Posted on August 26th, 2022 by editor@bowman

Our team completed the boundary and topographic survey of 10.2 miles for a proposed 24-in waterline from the Circleville Pump Station to the Jonah Special Utility District headquarters located in Williamson County.

Clearfork Emergency Access Bridge

Posted on August 15th, 2022 by editor@bowman

Our team was hired as a subconsultant to complete the design survey for the proposed City of Benbrook emergency access bridge across the Trinity River. We established control points and benchmarks at 500-ft intervals throughout the project site. Horizontal coordinates were obtained using GPS and vertical values were established by closed level loops from City of Fort Worth benchmarks.

City of Waco Airport Road Improvements

Posted on August 15th, 2022 by editor@bowman

Our team was contracted by the city of Waco to conduct a topographic survey of approximately two miles of an existing two-lane road. Due to the constant traffic along this road, it was determined that utilizing a UAV would be the safest approach to gathering the required data.

Hatfield Township – Cowpath & Orvilla

Posted on August 11th, 2022 by editor@bowman

Our team was retained by Hatfield Township for preliminary engineering and final design of this $3.9 million project. The engineering and construction for the project was funded with CFA-DCED and PennDOT MTF funds and Township Act 209 Impact Fee funds.