TRU Hotel by Hilton

Posted on February 24th, 2022 by editor@bowman

A 5-story, 127-room hotel is located on a 1.2-acre tract as part of an existing 9.5-acre campus. The campus includes two other chain hotels and a 6,300 sq. ft. restaurant. The team provided planning/zoning, landscape architecture, civil/site engineering and survey/topographic mapping.

Omni Louisville Hotel

Posted on February 24th, 2022 by editor@bowman

A 30-story mixed-use development in downtown Louisville consist of 612 hotel suites and 225 luxury apartment units. The hotel was built on the site of the former Louisville Water Co., and was design to blend the charm of the city and modern luxury.

Bowman Springs Road

Posted on February 22nd, 2022 by Renee Narvaez

Provided design survey for the improvements and right-of-way acquisition for 6,000 LF of Bowman Springs Road. The team established control points and benchmarks at 1,000-foot intervals throughout the project site. Horizontal coordinates were obtained using GPS and vertical values were established by closed level loops from City of Arlington control monuments.

Norton Audubon Hospital Campus Expansion

Posted on February 4th, 2022 by editor@bowman

As part of a four-year, $125M major renovations and additions project, the team provided surveying, site layout and civil engineering services for the Norton Audubon Hospital Campus site.

Baptist Health Medical Office Building

Posted on February 4th, 2022 by editor@bowman

The team is providing survey, site design, layout, planning approval, civil engineering and construction staking services for this new five-story 120,000 sq. ft. medical facility.

Boulder Valley School District – Districtwide Bond Facility Improvements

Posted on January 3rd, 2022 by editor@bowman

Bowman was selected under a multi-year term contract to assist the Boulder Valley School District reach aggressive energy-saving goals outlined in the District’s Sustainable Energy Plan. The plan includes zero net energy targets for new facilities and retrofit energy reductions. Bowman provided commissioning, energy audits, design assistance and monitoring/verifications services.

City of Edgewater Library and Civic Center

Posted on December 15th, 2021 by editor@bowman

Bowman provided energy modeling services for this municipal facility to achieve 47.5% energy cost savings versus code minimum construction, LEED Silver, and $24,000 in rebates from Xcel Energy.

City of Boulder On-Call Energy Evaluation and Climate Action Plan Life Cycle Study

Posted on December 7th, 2021 by Ji Lee

Bowman led a team that analyzed the possibility of reaching the City’s commitment to reducing greenhouse gas emissions in supporting the shift to carbon neutrality, eco-districts and building resiliency that the City is embracing.

City of Boulder On-Call Mechanical and Electrical Engineering

Posted on December 7th, 2021 by Suede

Bowman has been an on-call contract mechanical and electrical engineering service provider to the City of Boulder since 2013 providing MEP design. We are familiar with the Boulder Energy Conservation Code and the City’s commitment to reducing greenhouse gas emissions by at least 80% no later than 2050.

Buena Vista Middle and High School

Posted on December 6th, 2021 by editor@bowman

Bowman provided commissioning services to ensure the equipment is designed, installed, and performs as expected in concert with the owner’s requirements, delivering comfort and safety in support of the district goals.