Dulles International Park – Phases I-II

Posted on September 29th, 2020 by editor@bowman

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

FDOT District 4 Continuing Services

Posted on September 28th, 2020 by editor@bowman

Bowman is performing surveying, mapping and SUE services across Broward, Palm Beach, Martin, St. Lucie, and Indian River Counties. Under this program, our team helps to enhance and improve Florida’s roadways all while utilizing the latest standards in maintenance of traffic to ensure the safety of our team and the traveling public.

Loxahatchee River District Force Main Replacement

Posted on September 28th, 2020 by editor@bowman

Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.

Floresta Drive Design Survey

Posted on September 28th, 2020 by editor@bowman

Bowman is a subconsultant for the City of Port St. Lucie Floresta Drive Corridor to provide utility infrastructure investigation (ASCE Quality Level B) to identify the horizontal location of existing utilities within the project area.

United States Holocaust Memorial Museum

Posted on September 28th, 2020 by editor@bowman

Bowman performed 3D scanning and recordation to establish a system of measuring, documenting and monitoring surface loss, cracking, efflorescent growth, and alignment changes over time on the exterior surfaces of the limestone facades.

Windsor Water System Mapping

Posted on September 28th, 2020 by editor@bowman

To convert existing CAD data and hard copy maps of the water distribution system into a GIS framework, Bowman identified the water distribution system features including mains, valves, storage tanks, wells, services, meters, and fire hydrants.

Berkeley County Stormwater Assessment

Posted on September 28th, 2020 by editor@bowman

Bowman performed GIS asset locating, stormwater asset inventory and assessment of identified outfalls in several watersheds. Bowman also
collected and integrated photos in the assessment and completed metadata for the GIS to track data history and lineage.

Confidential Gas Mapping

Posted on September 28th, 2020 by editor@bowman

This large-scale mapping project encompasses data collection and mapping of nearly 5,000 miles of gas lines during a three-year contract period. This is a natural gas mapping project and Bowman technicians are collecting data for underground gas service and main lines, as well as above-ground gas features.

North Tarrant Express I-35W (Segment 3C)

Posted on September 25th, 2020 by editor@bowman

Bowman is part of a team providing design services and design management of the new I-30 Direct Connector, IH-820 DC at Mark IV Parkway and Segment 3C South Expressway. The scope includes roadway design, ITS and illumination, hydrologic/hydraulic analysis and traffic management and reconstruction of nine interchanges.

The Havenly at Fountain Hills

Posted on September 24th, 2020 by editor@bowman

Bowman’s first Build for Rent project with one- and two-story units, this 16-acre site is located on the rolling hills of Fountain Hills and features 147 units of one-, two- and three-bedroom homes with high-end amenities, a paseo through the middle of the site, and private gathering areas for each unit.