Confidential Filter Infrastructure

Posted on September 21st, 2020 by editor@bowman

Bowman provided the concrete slabs, foundations, and anchor designs for new infrastructure for the expansion of the Hydromet area to allow the SX/EW facili-ties to handle increased throughput. This work included the structural design and drawings, identifying civil components such as tops of concrete on footings and slabs, ensuring drainage to the existing drain sump and the addition of a contain-ment curb to improve capture of spills.

Confidential Haul Road Culverts

Posted on September 21st, 2020 by editor@bowman

As a result of a new pit being developed at the mine, a haul road was developed from the pit to the existing crushing facility. Bowman designed six (6) culverts that allow stormwater to flow under the new haul road.

County Road 804

Posted on September 20th, 2020 by editor@bowman

Grand County, Winter Park Ranch Water and Sanitation District, and the Town of Fraser had a common interest in completing infrastructure improvements in County Road 804, including a new storm sewer system, a water main replacement, and improvements to the existing road surface and new road striping.

Central Tri-State Tollway Improvements

Posted on September 20th, 2020 by editor@bowman

Bowman was responsible for Phase I and Phase II design for the Open Road Tolling Program, roadway widening, bridge widening, and toll and interchange ramp modifications on the I-294 tollway. Bowman worked closely with Illinois Tollway during Phase I and Phase II.

Lake Shore Drive Viaducts

Posted on September 20th, 2020 by Suede

Bowman provided Phase II design services for the replacement of the Lake Shore Drive (US 41) Viaducts over Lawrence Avenue and Wilson Avenue. Both roadways will be reconstructed to provide minimum vertical clearance under US 41 as well as a new typical section to accommodate shared bicycle lanes.

Route 229

Posted on September 20th, 2020 by editor@bowman

Bowman provided project management of the right-of-way and easement acquisition efforts and negotiations for 51 parcels to widen Route 229’s existing two-lane roadway to a four-lane roadway and provide curb and gutter, sidewalk, and a 10-foot shared-use path.

Route 460 Corridor Improvement Project

Posted on September 20th, 2020 by editor@bowman

This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.

CTC on Ellsworth

Posted on September 18th, 2020 by editor@bowman

CTC on Ellsworth features 145 units of two-bedroom and duplex one-bedroom single-story homes with high-end amenities and private backyards. Bowman provided planning, zoning support, entitlements, site planning, preliminary and final engineering, and construction support services.

Woodland Road Reconstruction

Posted on September 15th, 2020 by Suede

This two phase road reconstruction project involved approximately 6,600 lf of linear frontage. Bowman provided is planning and civil design services to analyze and redesign over a mile of public road infrastructure. The team also designed an expansion of the area to include bike lanes, new sidewalk, and drainage improvements.

Wheatlands

Posted on September 15th, 2020 by editor@bowman

Bowman provided planning and design services to support a multi-year mixed used area development. The team coordinated the design and submission of multiple interconnected planning packages to construct major public infrastructure and utility projects.