Whole Foods Rooftop Solar

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets; the height of the parapet off of the roof deck every 20 feet or where vertical changes occurred.

Woodland Road Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

This two phase road reconstruction project involved approximately 6,600 lf of linear frontage. Bowman provided is planning and civil design services to analyze and redesign over a mile of public road infrastructure. The team also designed an expansion of the area to include bike lanes, new sidewalk, and drainage improvements.

Wheatlands

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning and design services to support a multi-year mixed used area development. The team coordinated the design and submission of multiple interconnected planning packages to construct major public infrastructure and utility projects.

XTO to Bluestone Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided pipeline and ROW design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous road and railroad crossings, creeks and wetlands.

Villago

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided entitlement, design, engineering, and platting services for a 1,709-acre master planned community in Casa Grande, AZ. With the first phase designed and built, Bowman was hired to incorporate revisions to the remaining phases and accommodate adjustments in arterial roadway alignments, and park acreage as required by the City.

Waldorf Astoria Hotel

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed complete 3D laser scanning operations on the full exterior of the Waldorf Astoria in Manhattan to capture the existing conditions and improvements on the main rooftops and two existing towers.

Weequahic Park Playground Improvements

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided various services for the design of a new children’s playground which included replacing the old playground and improvements to the existing pavilion building. The playground was designed to provide dedicated outdoor social play areas for children aged 2-5 and 5-12. The two play areas are separated by a walkway, and both include climbers and swings at the appropriate skill levels.

VDOT Route 29, Berkmar Drive Extension

Posted on September 15th, 2020 by Renee Narvaez

The project consisted of establishing secondary control for survey work, performing field run topographic/planimetric surveys on approximately 80-acres, annotating the existing photogrammetry, property corner recovery and location, and storm sewer/drainage as-built preparation and delivery in accordance with VDOT standards.

VDOT Safety Rest Area Support Services

Posted on September 15th, 2020 by Renee Narvaez

This project involved the engineering/condition assessment of VDOT’s Safety Rest Areas water and wastewater facilities, totaling 21 different facilities throughout the Commonwealth.

Villages of Leesburg

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided land planning, surveying, and engineering design services for this mixed-use development located in the Town of Leesburg. Modeled after developments such as Reston Town Center, the project includes a Wegmans supermarket, and a town center like central core that will include a variety of supportive restaurant, retail, and office spaces.