VDOT Safety Rest Area Support Services
This project involved the engineering/condition assessment of VDOT’s Safety Rest Areas water and wastewater facilities, totaling 21 different facilities throughout the Commonwealth.
This project involved the engineering/condition assessment of VDOT’s Safety Rest Areas water and wastewater facilities, totaling 21 different facilities throughout the Commonwealth.
The development consists of 384 apartments, with a mix of 60% 2-bedrooms, 25% 1-bedroom and 15% 3-bedrooms. This site also proposes a community building/clubhouse/ pool and four (4) acres of commercial which is planned as a 100 room (4 Story) hotel and a 27,000 sq. ft. office building.
Bowman is providing structural and right-of-way services for this new interchange that will build Route 123 over Route 1 to separate through traffic, and connect Route 123 to Belmont Bay Drive east of the railroad. Both Routes will be widened from four to six lanes.
Bowman performed general surveying services under on-call survey contracts for Stafford County. These services cover property and topographic surveys for design property boundary surveys construction stake-outs and property plats indicating right-of-way and/or easement requirements.
The Rosslyn Commons project involved two towers with a total of 474 residential units and four levels of underground parking garage. The project consisted of the design of two underground stormwater management vaults, water and sanitary sewer connections, and frontage improvements.
Bowman provided surveying and engineering services for this improvement project including approximately 3,900 lf of divided road construction between Loudoun County Parkway and Hartley Place in Ashburn, VA
Bowman has worked on multiple Sam’s Club Store and Fueling Station projects throughout the United States, providing engineering, planning, surveying, and environmental due diligence studies. The scope also included underground utilities, erosion & sediment control and drainage plans.
Bowman has provided site engineering design, environmental reconnaissance and permitting, and topographic survey for the construction of five, 80 foot long, fair weather stream crossing structures, and 1,300 lf of new trail construction and rehabilitation of existing trail.
Bowman is part of a multi-disciplined design and planning team to deliver a multi-year redevelopment of an iconic former military medical center. The team is responsible for preliminary design and planning of civil infrastructure as well as public relations with various government and community bodies.
Bowman is providing a number of services, including but not limited to, site planning, planting design, topographic design for aesthetics, screening, pedestrian and way finding design, design of exterior common spaces, storm water and drainage design, and engineering complying with state and local authority standards, and environmental standards.