Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.
Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.
Bowman performed 3D scanning and recordation to establish a system of measuring, documenting and monitoring surface loss, cracking, efflorescent growth, and alignment changes over time on the exterior surfaces of the limestone facades.
To convert existing CAD data and hard copy maps of the water distribution system into a GIS framework, Bowman identified the water distribution system features including mains, valves, storage tanks, wells, services, meters, and fire hydrants.
Bowman has designed more than 20 Walgreen’s stores in Arizona, Maryland, and Virginia. Services provided include complex engineering designs, surveying, due diligence, feasibility studies, zoning and entitlement services, construction drawings, landscape architecture, and construction administration.
Loudoun County Public Schools retained Bowman for the construction of 4,800 sq. ft. 3-classroom additions to 6 existing elementary schools. Each school addition was a separate site plan design and application process including geometric layout, grading, roof drain design, analysis of the existing SWM/BMP system, erosion & sediment control measures, and coordination with the architect.
The project involves the construction of a new elementary school on the existing campus. To maintain critical open space, a new two-level below-grade parking structure with access from a new bus driveway was proposed below the footprint of the new school building. Bowman provided a full scope of civil engineering services.
Bowman provided project management of the right-of-way and easement acquisition efforts and negotiations for 51 parcels to widen Route 229’s existing two-lane roadway to a four-lane roadway and provide curb and gutter, sidewalk, and a 10-foot shared-use path.
This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.