Middlesex Water Authority Sewage Collection System

Posted on September 15th, 2020 by Renee Narvaez

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Bowman has completed this evaluation, developed and obtained approval of the Preliminary Engineering Report and has begun design to follow Hampton Roads Planning District Commission specifications. The scope involves the installation of approximately 42 miles of water distribu-tion piping sized from 12” down to 2″.

Martin County Aquatic Center

Posted on September 15th, 2020 by Renee Narvaez

The project includes the site civil engineering for the County Aquatic Center consisting of four pools and associated recreational amenities. Design and permitting of site civil engineering features including pool decking and drainage, access roadways and parking, stormwater management conveyance facilities, stormwater storage and treatment, site grading, water and wastewater utilities.

Clifton Water/Wastewater Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.

Charles City County Annual Services Contract

Posted on September 15th, 2020 by Renee Narvaez

Bowman was selected to perform utility engineering services for various water and wastewater systems. Bowman is responsible for attending various meetings with County staff and Supervisors, regulatory officials and representatives from the funding agencies in pursuit of financing for the below identified projects, as well as attending public meetings.

Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.