Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.

Bluestone to Sunoco Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, survey, and design services included pipeline and right-of-way design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous interstate highway, road and railroad crossings, creeks and wetlands.

Block Thirty Seven

Posted on September 15th, 2020 by Christina Nichols

Bowman provided civil site engineering services and prepared construction documents for the development of Block Thirty Seven, a mixed-use retail and entertainment, CTA transit station, office and retail project at 108 North State Street.

BB&T

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for preparation of topographic survey, coordination with field crew, preparation of Special Use Permit (SUP) application and supporting documents including conceptual plans and exhibits for Plan Commission meeting and public hearing, preparation of construction documents including landscape plans, utilities coordination, coordination and obtainment of permit, and construction administration.

Biltmore Shadows

Posted on September 15th, 2020 by Renee Narvaez

Bowman delivered a planning package for a compact 10-lot infill development including the design of public and private utilities and underground retention storage. The team also helped navigate burdensome development building codes to ensure compliance.

Academies of Loudoun

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for the land planning feasibility and commission permit legislative process, landscape architecture, arboriculture, civil engineering, environmental, and surveying services for Loudoun’s 320,000 sq. ft. premier STEM education facility combining the Academies of Science, Monroe Advanced Technical Academy, and the Academy of Engineering and Technology.

75th Street Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Phase I Engineering Services to evaluate four intersections to identify improvements that will address the accident history, increase the safety of the intersections, and create continuity throughout the corridor while minimizing impacts to the operational characteristics of the intersections. Includes Intersection Design Studies, Drainage Technical Memo and preparation of a Project Development Report for 75th Street.

55th Street Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.

31 & 32 Laurens Street

Posted on September 15th, 2020 by Renee Narvaez

Bowman has partnered with Southern Land Company to provide civil engineering and survey services for the development of the Society at Laurens – a luxury, mid-rise apartment community with 148 apartment units located in Charleston, South Carolina, The community will also include a resort style pool, lounge, fitness center, and business center.

3 Olive Park

Posted on September 15th, 2020 by Ji Lee

Bowman provided planning and preliminary design services for a 158-lot single family residential subdivision on a 40 acre site. Bowman provided land planning and entitlement services including PAD, General Plan Amendment and Preliminary Design documents. The team also worked closely with City planning officials to incorporate future infrastructure expansions into the project’s design.