UT Tennis Center, UTGC Recreational Swim Center, and TWC Residential Casitas

Posted on September 15th, 2020 by Renee Narvaez

This mixed-use project includes a tennis center with six indoor courts and four outdoor courts for University of Texas Athletics, a recreational swimming facility and concession building for The University of Texas Golf Club, and 20 residential “casitas” (condominiums). Bowman refined the land plan, designed the shared on-site and off-site infrastructure, and managed the site plan approval process.

George Mason University Faculty and Staff Housing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and land surveying services to this multi-phased, design-build housing project that consisted of 422 total units, including 75 apartments, 105-unit townhomes, 164 urban townhomes, 58 duplex units and 20 small lot units.

Discovery Elementary School

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, surveying, scanning, and construction administration services to support this new 98,000 sq. ft. elementary school on 25 acres.

Cople Elementary School Solar Project

Posted on September 15th, 2020 by Renee Narvaez

5-acre 2,100 solar panel array located on existing Elementary School property produces 1.2 megawatts a year, offset-ting the facilities carbon footprint by 865 tons of CO2. This project is part of a Power Purchase Agreement with Sun-Tribe Solar which resulted in no investment from the County and estimated to save $3.6 million over the solar array’s lifespan. Bowman provided comprehensive engineering and surveying services.

Classic & Fine Arts Academy (CAFA)

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its full scope planning, professional design, and construction management services to support the development of a charter school. The project required complex design aspects to accommodate the main facility and its ancillary support buildings and areas. The team also coordinated with local authorities for the expansion of public road and utility infrastructure to connect to the project.

Bloomfield College Residence Hall

Posted on September 15th, 2020 by Renee Narvaez

This project consisted of the design of a four-story, 83,000 sq. ft. residence hall centrally located on the campus of Bloomfield College. Bowman provided its core planning, surveying, and civil design services to facility the construction of a new campus multi-function area. The team’s role included land surveying, planning and feasibility studies, site plan development, preparation of construction documents, and construction administration and observation.

Arlington Public Schools On-Call

Posted on September 15th, 2020 by Renee Narvaez

Bowman was contracted to provide civil engineering services to support the investigation and feasibility of expanding various existing schools in Arlington County.

Academies of Loudoun

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for the land planning feasibility and commission permit legislative process, landscape architecture, arboriculture, civil engineering, environmental, and surveying services for Loudoun’s 320,000 sq. ft. premier STEM education facility combining the Academies of Science, Monroe Advanced Technical Academy, and the Academy of Engineering and Technology.