Aircraft Maintenance Hangar, Pensacola International Airport

Posted on September 19th, 2023 by Ji Lee

The City of Pensacola constructed a new aircraft maintenance hangar of approximately 160,000 sq. ft. and consists of two non-separated hangar bays and associated support spaces. As part of the design team, our fire protection engineers provided fire protection system design services and life safety analysis.

Costco, Boca Congress Center

Posted on September 1st, 2023 by Ji Lee

A traffic impact analysis was completed for the proposed amendment. The site included a 144,140 sq. ft. Costco warehouse, as well as a Costco gas station with 12 fueling positions. The amendment includes the addition of eight (8) additional fueling positions.

Cumberland Drive

Posted on September 1st, 2023 by Ji Lee

Our team redesigned Cumberland Drive between Military Trail and Village Boulevard to accommodate one-way, separated bicycle lanes using vertical delineators. The project also included design of a roundabout at the Saratoga Road intersection that accommodated separate bicycle and pedestrian crossing treatments. Efforts included agency coordination.

Fairgrounds Road Improvement

Posted on September 15th, 2022 by editor@bowman

This project consisted of the survey and design for paving of approximately 5,000 LF of existing dirt roadway on Fairground Road in Molino, FL. The project scope included surveying, right-of-way acquisition, permitting, and paving and drainage design.

Fort Pickens Pedestrian Pier

Posted on September 15th, 2022 by editor@bowman

Our team of experts worked with the Army Corps of Engineers (COE) to perform a controlled topographic survey at Fort Pickens Beach to establish control points for the piles to accommodate the building of a pedestrian pier. The survey was controlled because artifacts had been discovered close to the proposed construction site.

Dunaway Water Treatment Facility

Posted on September 14th, 2022 by editor@bowman

Our team of experts provided complete civil engineering and surveying services for design, preparation of construction plans and specifications, and permitting, bidding, and construction inspection and administration of a new Water Treatment Plant and stormwater management pond at the Dunaway well site for ECUA.

National Flight Academy and Exhibit Hanger

Posted on September 14th, 2022 by Suede

This project included the design and permitting of the National Flight Academy and Exhibit Hanger at the Museum of Naval Aviation on board Pensacola Naval Air Station.

Escambia County ADA Studies

Posted on September 14th, 2022 by Suede

This project consisted of the evaluation of nine buildings and eight parks to determine if they meet current American Disabilities Act Standards for access by handicapped individuals. In addition to the nine building facilities, there were 28 buildings and 78 ballfields at the eight parks.

Airport and Davis Highway Development Improvements

Posted on September 13th, 2022 by editor@bowman

This project included preliminary planning, sitework design, preparation of construction plans and specifications, permitting and construction administration for a 7,000 sq. ft. commercial building, a 7,758 sq. ft. restaurant and a future commercial building on a 3.3 acre site.

Cape Canaveral National Cemetery

Posted on September 12th, 2022 by Suede

$30M project will add approximately 32,200 grave sites on 30 acres. The team provided surveying and civil engineering services for the Phase 2 expansion. The scope included topographic survey that located trees, existing utilities and all improvements.