Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Desert Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a variety of survey services to support the development of a proposed 150 turbine, 330-megawatt wind farm. The team was responsible for preparing and recertification for ALTA surveys and pos construction as-builts.

Bradley and Carter Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared ALTA/ACSM surveys, detailed topographic survey including necessary road frontage surveying. Approximately 25 acres of topography were required on the Bradley farm site, and approximately 35 acres of topography were required on the Carter farm site, as a minimum 75-foot overlap around the perimeter.

Bowen Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.

Alexis Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman established the primary geodetic control network consisting of 20 control monuments throughout a 70,000 acre wind farm development in Western Illinois. Bowman used GPS static observations and advanced post-processing adjustments to establish NAD83 horizontal and NGVD88 vertical datum to support the boundary survey and ALTA/ACSM Land Title Survey and future construction stakeout for this wind farm.