ArtCenter College of Design
The ArtCenter College of Design sought to enhance its South Campus. Our team was brought on board to implement advanced 3D laser scanning and Revit modeling, laying the groundwork for these improvements.
The ArtCenter College of Design sought to enhance its South Campus. Our team was brought on board to implement advanced 3D laser scanning and Revit modeling, laying the groundwork for these improvements.
Our team served as the electrical, civil, and structural engineer for the Wadesboro Solar project. We also acted as the design project manager, working closely with the developer, installer and equipment manufacturers to efficiently execute the design of this 5 MW AC (7.65 MW DC) solar PV system located in Wadesboro, NC.
Spencer Meadow Solar and Lowe Country Solar (Spencer & Lowe) are a pair of twin projects near Asheboro, NC. Our team provided the electrical and structural engineering, a comprehensive plan set and construction support.
This project was located on the coast in harsh and wet environmental conditions near the North Carolina Albermarle Sound. Our team provided the full electrical design (PV system, auxiliary power, medium voltage design) and the structural design (inverter group structures, equipment pads).
Our team worked with a local utility company, Delta Montrose Electric Association (DMEA) to design 10 kW grid connected PV systems for several local schools. In addition to providing modest energy offset, these solar electric systems serve as educational and demonstration systems at five high schools located in Delta and Montrose counties.
Our engineering team worked closely with the racking manufacturer and civil engineer to optimize the site for installation and system performance. The layout takes advantage of the slight southern facing slope of the parcel, while varied east to west spacing and backtracking reduces inter-row shading on the rolling terrain.
Temperance Solar and Bingham Solar are two projects located in Michigan and are 29.7 MWDC and 29.3 MWDC in size, respectively. Our team, in partnership with J-Ranck Electric, provided civil, structural and electrical engineering, and assisted with commissioning. The substations for each project were prepared in-house under the supervision of our medium/high voltage engineer.
Our team was hired to perform a combined multi-beam side scanning sonar and LiDAR investigation to produce 3-D digital model of the vertical surface of the Troy seawall above and below the water surface. This continuous model produced a high resolution “picture” of the wall.
Bowman provided dual mapping data as part of the flood warning and optimization system in addition to maintenance and inspection contracts statewide. The team was contracted to provide bank-to-bank bathymetric mapping and simultaneous LiDAR data collection of the Mohawk River between Locks E8 and E7 to support flood modeling activities.
Our team performed a multi-disciplinary mapping and sediment characterization study for Bergmann Associates. The project located at lock C/S-1 at the northern end of Cayuga Lake entailed performing multi-beam echosounding, single beam echosounding, aerial UAV topographic mapping, GPS survey, utility location and sediment sampling.