Carteret Dock 1 Renewal

Posted on December 7th, 2022 by Jillian Taylor

Our team was retained to perform an underwater inspection of Dock 1, review the construction and current condition of the existing dock and design the renewal of Dock 1 in a phased manner. Scope of work included developing several alternates for the construction of new breasting and mooring structures with the estimated construction costs.

Eagle Point Dock No. 2 Modifications

Posted on December 6th, 2022 by Jillian Taylor

Retained to perform a repair design underwater inspection, develop feasible options for rehabilitation, secure environmental permits, perform final design and detailing, perform construction inspection and management. Static and dynamic mooring analysis were also performed.

Buckeye Mooring Renewal and Gangway Installation

Posted on December 6th, 2022 by Jillian Taylor

Performed an underwater inspection to evaluate the structural condition of structures supporting the gangway and mooring hooks. Provided construction inspection and management services during the installation of gangway and mooring hooks.

Mined Land Reclamation Articulated Concrete Blocks

Posted on December 1st, 2022 by editor@bowman

Confidential client in SE Arizona commissioned Bowman to conduct construction quality assurance (CQA) for articulated concrete blocks (ACB’s) installed in reclaimed mine areas for spillway down chutes. Verified installation of subgrade, geotextile, filter layer, geogrid, mats, concrete grout lines and anchor trenches to meet manufacturer’s specifications.

Heavy Duty Truck Shop Wash Rack

Posted on December 1st, 2022 by editor@bowman

Bowman provided engineering services for the detail engineering for the Heavy-Duty Truck Shop (HDTS) traffic area grading and a new truck wash rack to replace existing inadequate infrastructure.

Mineral Creek Concrete Liner Repairs

Posted on November 30th, 2022 by editor@bowman

A mile-long concrete channel was constructed at the ASARCO Ray Mine to convey contact water from the Mineral Creek outlet downstream near the mine entrance. A mile-long concrete channel was constructed at the ASARCO Ray Mine to convey contact water from the Mineral Creek outlet downstream near the mine entrance.

ASARCO Hayden Operations Slag Processing Project

Posted on November 30th, 2022 by editor@bowman

Bowman provided construction management, quality assurance, plant commissioning and coordination between contractors during the commissioning and start-up phase. 

BIM 360 Transition Project

Posted on November 30th, 2022 by Renee Narvaez

Bowman was contracted to scan historic drawings and organize drawing files for easy retrieval using laptops and notepads in the field. Our team migrated existing drawing storage system into BIM 360 input meta-data to allow for easy retrieval of information.

ASARCO Ray Mine Big Box Lake Dredging

Posted on November 30th, 2022 by editor@bowman

Bowman is providing construction management services that includes mechanical dredging of approximately 1M cubic yards of sediment, haulage, and disposition of dredged materials to a stockpile area 1.75 miles from the reservoir dam.

ASARCO Ray Mine PLS Tank Repair

Posted on November 10th, 2022 by editor@bowman

PLS is stored in a stainless steel lined concrete tank at the ASARCO Ray Mine. During construction, the tank was inspected by several techniques but approximately 35 leaks were detected and attributed to defective and substandard welds. Bowman was asked to inspect and catalog the weld where leaks developed and to work with a specialized welding firm to implement a plan to repair the tank permanently.