Clifton Guest House Structural Investigation

Posted on November 3rd, 2022 by editor@bowman

Bowman was commissioned to perform a geotechnical/foundation, structural/framing and plumbing investigation to address observed deteriorating and distressed conditions of the house.

ASARCO Hayden Concentrator AB-BC Tailings Storage Facility Stability Buttress

Posted on November 3rd, 2022 by editor@bowman

Bowman provided construction quality assurance (CQA) services. The project includes site preparation, utility abandonment, earthwork for the stability buttress, Gila and San Pedro River crossings, constructed drainage to the emergency ponds and emergency channel, storm water management systems, and other improvements.

Reverse Osmosis and Filter Press Plant Design and Instrumentation Upgrades

Posted on November 3rd, 2022 by editor@bowman

Bowman provided designs and documentation services. including review of existing drawings and project information, engineering calculations, process and instrumentation drawings, process flow diagrams, piping/mechanical drawings, sections details, mechanical equipment list and specifications and electrical and instrumentation controls.

Port Construction Inspection

Posted on October 28th, 2022 by Jillian Taylor

Provided full-time construction inspection for a project recently designed by the team. The project involved the construction of two mooring dolphins to tie up ships up to 750 FT long and other associated construction work.

Petco Park

Posted on September 28th, 2022 by editor@bowman

Provided civil engineering, construction survey, and environmental planning on the new Padres ballpark (Petco Park). As the lead civil engineer on the project, we provided a broad range of services including hardscape plans for the utilities to serve the ballpark and surrounding five plazas and streets; land use studies; cost estimates; construction-staking surveying; and construction management.

SANBAG Downtown Passenger Rail Project

Posted on September 28th, 2022 by Renee Narvaez

For the last three years the team has been conducting a detailed 10-mile railroad RW, aerial mapping and design survey data collection associated with a proposed commuter rail improvement project that crosses three cities in San
Bernardino County.

West Lagoon Avenue Multi-Use Path and Resurfacing

Posted on September 15th, 2022 by editor@bowman

For this project, our group of professionals provided engineering and surveying services for the West Lagoon multi-use path and resurfacing project located in Gulf Shores, AL. Our team’s work included pavement evaluation, resurfacing, land rights acquisition, drainage Improvements, bicycle lane and multi-use path services.

Fairgrounds Road Improvement

Posted on September 15th, 2022 by editor@bowman

This project consisted of the survey and design for paving of approximately 5,000 LF of existing dirt roadway on Fairground Road in Molino, FL. The project scope included surveying, right-of-way acquisition, permitting, and paving and drainage design.

Fort Pickens Pedestrian Pier

Posted on September 15th, 2022 by editor@bowman

Our team of experts worked with the Army Corps of Engineers (COE) to perform a controlled topographic survey at Fort Pickens Beach to establish control points for the piles to accommodate the building of a pedestrian pier. The survey was controlled because artifacts had been discovered close to the proposed construction site.

Dunaway Water Treatment Facility

Posted on September 14th, 2022 by editor@bowman

Our team of experts provided complete civil engineering and surveying services for design, preparation of construction plans and specifications, and permitting, bidding, and construction inspection and administration of a new Water Treatment Plant and stormwater management pond at the Dunaway well site for ECUA.