Tuscarora High School
Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.
The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.
Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.
Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.
Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.
Bowman is performing surveying, mapping and SUE services across Broward, Palm Beach, Martin, St. Lucie, and Indian River Counties. Under this program, our team helps to enhance and improve Florida’s roadways all while utilizing the latest standards in maintenance of traffic to ensure the safety of our team and the traveling public.
Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.
Bowman is a subconsultant for the City of Port St. Lucie Floresta Drive Corridor to provide utility infrastructure investigation (ASCE Quality Level B) to identify the horizontal location of existing utilities within the project area.
Bowman performed 3D scanning and recordation to establish a system of measuring, documenting and monitoring surface loss, cracking, efflorescent growth, and alignment changes over time on the exterior surfaces of the limestone facades.