GWU Old Main
Our engineers provided mechanical, electrical, and plumbing design services for the renovation of this 60,000 sq. ft., four-story historic building in Washington, DC.
Our engineers provided mechanical, electrical, and plumbing design services for the renovation of this 60,000 sq. ft., four-story historic building in Washington, DC.
Our team was selected to provide mechanical, electrical, and plumbing engineering services for the new 120,000 sq. ft. Ernst and Young McLean offices and conference center.
The project involves the design and construction administration for five floors of corporate office space.
Bowman is providing MEP engineering design for the 31-story, 729,000 sq. ft. class A, corporate headquarters building in Tyson’s Corner, Virginia. The building features 68,000 sq. ft. of retail space in addition to a 495,000 sq. ft. office. Parking includes eight levels of above grade and four levels below grade.
Bowman provided MEP engineering design services for this 14-story 292,000 sq. ft. core and shell class A high-rise office building meeting the WELL Building Institute certification. The building achieved a LEED Gold certification. In addition to the base building systems, Bowman provided the MEP engineering for the tenant interior design.
Bowman has been contracted by Royal Farms in providing site/civil engineering for the construction of new convenience stores and gas stations located across Virginia. Bowman has provided due diligence and site layout and design for each of the stores.
Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.
A dual culvert under Moseby Drive in the City of Manassas Park, Virginia became compromised during a storm and collapsed. As a result, a townhouse community of over 400 residents became inaccessible to vehicle traffic and also severed the water and sanitary utilities. Bowman was called upon by the City to lead efforts to restore the vital connection.
Bowman provided surveying services for the demolition of an existing school and the construction of a new 2-story elementary school building. Surveying services were provided to aid three development companies, including construction staking for the construction of the site, utilities, and the building’s infrastructure.
Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.