Windsor Water System Mapping

Posted on September 28th, 2020 by Renee Narvaez

To convert existing CAD data and hard copy maps of the water distribution system into a GIS framework, Bowman identified the water distribution system features including mains, valves, storage tanks, wells, services, meters, and fire hydrants.

Berkeley County Stormwater Assessment

Posted on September 28th, 2020 by Renee Narvaez

Bowman performed GIS asset locating, stormwater asset inventory and assessment of identified outfalls in several watersheds. Bowman also
collected and integrated photos in the assessment and completed metadata for the GIS to track data history and lineage.

Confidential Gas Mapping

Posted on September 28th, 2020 by editor@bowman

This large-scale mapping project encompasses data collection and mapping of nearly 5,000 miles of gas lines during a three-year contract period. This is a natural gas mapping project and Bowman technicians are collecting data for underground gas service and main lines, as well as above-ground gas features.

North Tarrant Express I-35W (Segment 3C)

Posted on September 25th, 2020 by Renee Narvaez

Bowman is part of a team providing design services and design management of the new I-30 Direct Connector, IH-820 DC at Mark IV Parkway and Segment 3C South Expressway. The scope includes roadway design, ITS and illumination, hydrologic/hydraulic analysis and traffic management and reconstruction of nine interchanges.

The Havenly at Fountain Hills

Posted on September 24th, 2020 by Renee Narvaez

Bowman’s first Build for Rent project with one- and two-story units, this 16-acre site is located on the rolling hills of Fountain Hills and features 147 units of one-, two- and three-bedroom homes with high-end amenities, a paseo through the middle of the site, and private gathering areas for each unit.

FM 2325

Posted on September 22nd, 2020 by Renee Narvaez

Bowman provided design and right of way services for roadway widening and turn-lane improvements to 3.1-miles of FM 2325 including design and right-of-way survey, right-of-way condemnation/donation assistance, environmental permitting, revised project schematic, preparation of construction plans, specifications and construction cost estimates.

FM 110

Posted on September 22nd, 2020 by Renee Narvaez

Bowman provided land surveying, right-of-way coordination, construction plans review, and QA/QC support for the design and construction of a portion of Farm to Market 110 (San Marcos Loop).

Modera Berkeley Heights

Posted on September 22nd, 2020 by Renee Narvaez

This new multi-family residential building is sited on just over 5 acres of land. The project includes 173 residential units within the 4-story building. Bowman became involved at the onset of the project and worked project stakeholders to create this concept from a township approved redevelopment plan.

Modera Woodbridge

Posted on September 22nd, 2020 by Jillian Taylor

Bowman provided landscape architecture services for this new multi-family residential building, situated on just over 2 acres of land. The project includes 279 residential units within the 7-story building, an exterior pocket park, and amenity spaces including two courtyards and rooftop terrace.

Lowe’s Home Improvement

Posted on September 22nd, 2020 by editor@bowman

Bowman provides a variety of engineering, survey and consulting services for home improvement warehouses, including project management and construction services. The typical site is 14 to 30 acres, with approximately 180,000 sq. ft. of retail space.