Route 643 Shellhorn Road
Bowman provided surveying and engineering services for this improvement project including approximately 3,900 lf of divided road construction between Loudoun County Parkway and Hartley Place in Ashburn, VA
Bowman provided surveying and engineering services for this improvement project including approximately 3,900 lf of divided road construction between Loudoun County Parkway and Hartley Place in Ashburn, VA
Bowman supported the Town of Queen Creek on an improvement project for water and sewer collection system improvements within the mid-section Ryan Road Alignment. Bowman provided survey and design engineering services for this project.
Salt River Project (SRP) is one of Arizona’s largest utilities providing low-cost, reliable power and water to Central Arizona. Bowman crews performed 3D scans of all arterial roads, sub-arterial roads, alleys, and canals within these two sections.
Bowman led a team consisting of aviation consultants, structural engineers and MEP engineers to design an all-aluminum helipad structure which met FAA and ADA guidelines and provided a proper arrival experience to their premier clients befitting of the Seminole Tribe of Florida and Hard Rock Casino Brands.
Bowman is responsible for Phase I, II and III engineering services to upgrade the existing Shermer Road Bridge to meet current structural, hydraulic and geometric requirements.
Bowman provided creative design solutions on a challenging topographic residential site. The team also successfully navigated a variety of local, state, and federal permit plans and applications to deliver a successful project.
Bowman has worked on multiple Sam’s Club Store and Fueling Station projects throughout the United States, providing engineering, planning, surveying, and environmental due diligence studies. The scope also included underground utilities, erosion & sediment control and drainage plans.
Bowman served as project manager and lead designer/planner and provided environmental assessments for the expansion and realignment of approximately 14 miles of Ranch Road 12 between Dripping Springs and Wimberley in Hays County, Texas.
Bowman has provided site engineering design, environmental reconnaissance and permitting, and topographic survey for the construction of five, 80 foot long, fair weather stream crossing structures, and 1,300 lf of new trail construction and rehabilitation of existing trail.
Bowman provided all surveying services in conjunction with the expansion of Norfolk Southern’s existing Intermodal Facility. The team’s surveying services included establishing control, construction staking/layout of track and facilities, and volumetric surveys.