Cast Iron Pipe Replacement Program

Posted on September 15th, 2020 by Renee Narvaez

Bowman was hired as a primary engineering consultant, and completed the design, engineering and permitting for 17 miles of pipeline replacement. The majority of the designs were in major metropolitan cities or urban areas, with significant construction conflicts of other underground utilities. Included in the designs were the tie-in details, by-pass details, complete bill of materials, and service connections.

Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.

Bowen Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.

Bradley and Carter Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared ALTA/ACSM surveys, detailed topographic survey including necessary road frontage surveying. Approximately 25 acres of topography were required on the Bradley farm site, and approximately 35 acres of topography were required on the Carter farm site, as a minimum 75-foot overlap around the perimeter.

Bordentown Waterfront Community

Posted on September 15th, 2020 by Christina Nichols

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Bluestone to Sunoco Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, survey, and design services included pipeline and right-of-way design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous interstate highway, road and railroad crossings, creeks and wetlands.

Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.