Dominion Energy Critical Transmission Substation Security Plan

Posted on November 30th, 2020 by Renee Narvaez

Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.

Moseby Drive

Posted on October 27th, 2020 by Renee Narvaez

A dual culvert under Moseby Drive in the City of Manassas Park, Virginia became compromised during a storm and collapsed. As a result, a townhouse community of over 400 residents became inaccessible to vehicle traffic and also severed the water and sanitary utilities. Bowman was called upon by the City to lead efforts to restore the vital connection.

Tuscarora High School

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.

Project Talon II Admin/Data Center

Posted on September 29th, 2020 by Renee Narvaez

Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.

Confidential Arizona Data Center

Posted on September 29th, 2020 by Renee Narvaez

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.

Western Suburb Data & Cloud Centers

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.

Northern Virginia Data Center Phases I-III

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

Loxahatchee River District Force Main Replacement

Posted on September 28th, 2020 by Renee Narvaez

Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.

North Tarrant Express I-35W (Segment 3C)

Posted on September 25th, 2020 by Renee Narvaez

Bowman is part of a team providing design services and design management of the new I-30 Direct Connector, IH-820 DC at Mark IV Parkway and Segment 3C South Expressway. The scope includes roadway design, ITS and illumination, hydrologic/hydraulic analysis and traffic management and reconstruction of nine interchanges.