Tuscarora High School

Posted on September 29th, 2020 by editor@bowman

Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.

Project Talon II Admin/Data Center

Posted on September 29th, 2020 by editor@bowman

Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.

Confidential Arizona Data Center

Posted on September 29th, 2020 by Suede

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.

Western Suburb Data & Cloud Centers

Posted on September 29th, 2020 by Suede

Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.

Northern Virginia Data Center Phases I-III

Posted on September 29th, 2020 by editor@bowman

Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by editor@bowman

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

Loxahatchee River District Force Main Replacement

Posted on September 28th, 2020 by Renee Narvaez

Bowman recently provided Subsurface Utility Engineering services for Olympus Drive force main replacement design in Juno Beach within US Highway 1 and Ocean Drive, along Olympus Drive and Celestial Way.

North Tarrant Express I-35W (Segment 3C)

Posted on September 25th, 2020 by Renee Narvaez

Bowman is part of a team providing design services and design management of the new I-30 Direct Connector, IH-820 DC at Mark IV Parkway and Segment 3C South Expressway. The scope includes roadway design, ITS and illumination, hydrologic/hydraulic analysis and traffic management and reconstruction of nine interchanges.

The Havenly at Fountain Hills

Posted on September 24th, 2020 by Renee Narvaez

Bowman’s first Build for Rent project with one- and two-story units, this 16-acre site is located on the rolling hills of Fountain Hills and features 147 units of one-, two- and three-bedroom homes with high-end amenities, a paseo through the middle of the site, and private gathering areas for each unit.

FM 2325

Posted on September 22nd, 2020 by Renee Narvaez

Bowman provided design and right of way services for roadway widening and turn-lane improvements to 3.1-miles of FM 2325 including design and right-of-way survey, right-of-way condemnation/donation assistance, environmental permitting, revised project schematic, preparation of construction plans, specifications and construction cost estimates.