Norton Audubon Hospital Campus Expansion
As part of a four-year, $125M major renovations and additions project, the team provided surveying, site layout and civil engineering services for the Norton Audubon Hospital Campus site.
As part of a four-year, $125M major renovations and additions project, the team provided surveying, site layout and civil engineering services for the Norton Audubon Hospital Campus site.
The team is providing survey, site design, layout, planning approval, civil engineering and construction staking services for this new five-story 120,000 sq. ft. medical facility.
Bowman has been contracted by Royal Farms in providing site/civil engineering for the construction of new convenience stores and gas stations located across Virginia. Bowman has provided due diligence and site layout and design for each of the stores.
Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.
A dual culvert under Moseby Drive in the City of Manassas Park, Virginia became compromised during a storm and collapsed. As a result, a townhouse community of over 400 residents became inaccessible to vehicle traffic and also severed the water and sanitary utilities. Bowman was called upon by the City to lead efforts to restore the vital connection.
Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.
Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.
The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.
Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.
Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.