Four Roses Bourbon Distillery
Bowman provided 3-D laser scanning, planning and zoning expertise, landscape architecture, survey, site civil engineering, structural engineering and comprehensive construction administration/observation services.
Bowman provided 3-D laser scanning, planning and zoning expertise, landscape architecture, survey, site civil engineering, structural engineering and comprehensive construction administration/observation services.
Bowman was engaged to provide engineering and survey services for the park’s iconic pyramid structures, visitors’ center and both rickhouses.
Explorer Pipeline was directed by the Oklahoma Turnpike Authority to relocate a portion of their 28” pipeline in the western portion of Tulsa County in Oklahoma due to the proposed construction of a new tollway.
The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.
Our team provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway in Lynwood, CA. Other activities included renovating sidewalks, driveway approaches, curbs and gutters and constructing six new bus pads.
The scope of work under Phase II of the Montebello Boulevard Bike Lane and Sidewalk Improvement project included design, preparation of PS&E for roadway improvements and widening, pavement rehabilitation, concrete improvements, sidewalk improvement, utility adjustments, ADA improvements, Class II bike lane, traffic signal improvements and pedestrian lighting
The scope of work included replacing existing streetlight and traffic signal infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the Baldwin Park community.
Our team was retained to perform traffic engineering and highway design services in support of the 128-room, four-story hotel and car wash facility along US Route 206 in Bordentown Township. We prepared the project traffic impact study, highway access permit plans in support of site plan approval by the Township and Access Permit approval by NJDOT.
The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.
Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sg. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.