ERM Solar City

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed various services for the proposed 1099 kW solar array: New Solar Field, 4 AC, Greenport, NY – surveying and site plan preparation including boundary survey research of 4 acres. Carnegie Center Solar Canopy Project, West Windsor, NJ – surveying and site plan preparation on 4 Sites.

Cople Elementary School Solar Project

Posted on September 15th, 2020 by Renee Narvaez

5-acre 2,100 solar panel array located on existing Elementary School property produces 1.2 megawatts a year, offset-ting the facilities carbon footprint by 865 tons of CO2. This project is part of a Power Purchase Agreement with Sun-Tribe Solar which resulted in no investment from the County and estimated to save $3.6 million over the solar array’s lifespan. Bowman provided comprehensive engineering and surveying services.

Desert Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a variety of survey services to support the development of a proposed 150 turbine, 330-megawatt wind farm. The team was responsible for preparing and recertification for ALTA surveys and pos construction as-builts.

Bradley and Carter Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared ALTA/ACSM surveys, detailed topographic survey including necessary road frontage surveying. Approximately 25 acres of topography were required on the Bradley farm site, and approximately 35 acres of topography were required on the Carter farm site, as a minimum 75-foot overlap around the perimeter.

Bowen Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.

Alexis Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman established the primary geodetic control network consisting of 20 control monuments throughout a 70,000 acre wind farm development in Western Illinois. Bowman used GPS static observations and advanced post-processing adjustments to establish NAD83 horizontal and NGVD88 vertical datum to support the boundary survey and ALTA/ACSM Land Title Survey and future construction stakeout for this wind farm.