Reverse Osmosis and Filter Press Plant Design and Instrumentation Upgrades

Posted on November 3rd, 2022 by Renee Narvaez

Bowman provided designs and documentation services. including review of existing drawings and project information, engineering calculations, process and instrumentation drawings, process flow diagrams, piping/mechanical drawings, sections details, mechanical equipment list and specifications and electrical and instrumentation controls.

Arundel Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new ±113,000 sq. ft. elementary school (Pre K-2 Grade) with student capacity of 636. The team provided mechanical, plumbing and fire protection design. The scope included all new HVAC system, nine variable refrigerant systems and three single zone VAV rooftop units.

Wheaton Woods Elementary School

Posted on May 20th, 2022 by Renee Narvaez

A new elementary school is designed to accommodate 740 students. The team provided mechanical, electrical, plumbing and fire protection design, and the facility was designed to exceed ASHRAE 90.1 requirements, IBC and Montgomery County Energy Conservation Codes, as well as recommendations from the publication “Energy Efficient Design for New Buildings.”

BTI 360

Posted on March 28th, 2022 by Amy Talton

Bowman provided the mechanical, electrical and plumbing design for BTI360’s beautiful 30,000 sq. ft. build-out. At a time where many companies were leaving their offices and opting for a work-from-home model, BTI360 decided to create a flexible and dynamic space. The new office is full of hubs and collaborative spaces to host internal classes, hackathons, technical meetups and team building events.

Arlington County Electric Vehicle Infrastructure

Posted on January 14th, 2022 by Renee Narvaez

Bowman is providing engineering design services for the electrical systems at eleven County facilities. Scope of work includes evaluation of existing electrical infrastructure at each facility, recommendations report for the installation of Level 2 and Level 3 EV charging stations, and preparation of permit-ready drawings for installation.

Boulder Valley School District – Districtwide Bond Facility Improvements

Posted on January 3rd, 2022 by Renee Narvaez

Bowman was selected under a multi-year term contract to assist the Boulder Valley School District reach aggressive energy-saving goals outlined in the District’s Sustainable Energy Plan. The plan includes zero net energy targets for new facilities and retrofit energy reductions. Bowman provided commissioning, energy audits, design assistance and monitoring/verifications services.

City of Edgewater Library and Civic Center

Posted on December 15th, 2021 by Renee Narvaez

Bowman provided energy modeling services for this municipal facility to achieve 47.5% energy cost savings versus code minimum construction, LEED Silver, and $24,000 in rebates from Xcel Energy.

City of Boulder On-Call Energy Evaluation and Climate Action Plan Life Cycle Study

Posted on December 7th, 2021 by Ji Lee

Bowman led a team that analyzed the possibility of reaching the City’s commitment to reducing greenhouse gas emissions in supporting the shift to carbon neutrality, eco-districts and building resiliency that the City is embracing.

City of Boulder On-Call Mechanical and Electrical Engineering

Posted on December 7th, 2021 by Renee Narvaez

Bowman has been an on-call contract mechanical and electrical engineering service provider to the City of Boulder since 2013 providing MEP design. We are familiar with the Boulder Energy Conservation Code and the City’s commitment to reducing greenhouse gas emissions by at least 80% no later than 2050.

Weld County School District RE-4

Posted on December 6th, 2021 by Renee Narvaez

Bowman was selected for third party commissioning services for the construction of a new High School (HS2), renovation and addition to an existing High School (WHS), and MEP upgrades to 10 other District facilities.