Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Discovery Elementary School

Posted on September 15th, 2020 by editor@bowman

Bowman provided civil engineering, surveying, scanning, and construction administration services to support this new 98,000 sq. ft. elementary school on 25 acres.

Dominion Power

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided topographic, physical and boundary surveying services, as well as civil engineering services including grading, drainage, and erosion & sediment control. The team was challenged to design with existing drainage problems in an area prone to flooding.

Desert Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a variety of survey services to support the development of a proposed 150 turbine, 330-megawatt wind farm. The team was responsible for preparing and recertification for ALTA surveys and pos construction as-builts.

CR 266

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided core planning, drainage design, land surveying and environmental services for roadway improvements to an additional 1.9-mile section of CR 266. The team worked closely with local and state officials to ensure planning and ultimate design met growth targets and municipal goals. The team also coordinated with utility companies for the extension and or relocation of service lines.

Cople Elementary School Solar Project

Posted on September 15th, 2020 by Renee Narvaez

5-acre 2,100 solar panel array located on existing Elementary School property produces 1.2 megawatts a year, offset-ting the facilities carbon footprint by 865 tons of CO2. This project is part of a Power Purchase Agreement with Sun-Tribe Solar which resulted in no investment from the County and estimated to save $3.6 million over the solar array’s lifespan. Bowman provided comprehensive engineering and surveying services.

Confidential Early Mine Water Supply

Posted on September 15th, 2020 by editor@bowman

Bowman developed a water distribution plan to provide potable and construction water to thhis project. This included the design of wells, impoundments, booster stations, overland pipelines and storage facilities. The first stage of this system currently operates at 650 psi and transports water over 2 miles.

Confidential Conveyor Corridor

Posted on September 15th, 2020 by editor@bowman

A new leach pad is being developed to meet the needs of a new pit. A major earthwork project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork and new traffic underpass.

Closter Plaza

Posted on September 15th, 2020 by editor@bowman

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Classic & Fine Arts Academy (CAFA)

Posted on September 15th, 2020 by editor@bowman

Bowman provided its full scope planning, professional design, and construction management services to support the development of a charter school. The project required complex design aspects to accommodate the main facility and its ancillary support buildings and areas. The team also coordinated with local authorities for the expansion of public road and utility infrastructure to connect to the project.