Ken Lawrence Stream Valley Trail

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided full service engineering, environmental, surveying and construction administration for the restoration of 800 lf of degraded stream valley, installation of 1,000 lf of new trails, and a 30 foot long pedestrian bridge crossing, as well as the first two synthetic turf fields in Tysons Virginia.

Hutto YMCA

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core services including planning, layout, surveying, design and coordination, permitting, bidding and construction observation for this 4-acre YMCA facility. In addition, Bowman was tasked with the coordination of all approvals, permitting and platting with the City of Hutto, Williamson County, and the Texas Commission of Environmental Quality (TCEQ).

John Rolfe Pkwy & Ridgefield Pkwy Sidewalk Improvements

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, surveying and civil design services including topographic and route surveys, land records research, easement and right-of-way acquisitions, tree inventory/analysis/management and supplemental landscape plans. Also provided conceptual design development, final construction drawing preparation, cost estimating, bid phase services, construction administration, construction stakeout, as-built surveys and close out reporting.

John Rolfe Square

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying and platting, civil engineering, traffic signal design, rezoning, public participation, construction plan approvals, and construction administration for an upscale, urban village style, 55+ age single-family neighborhood, community park, extensive landscaping, and amenities. Bowman also facilitated a solution to provide extensive planning and hardscape design amidst existing easements associated with prior roadway plans.

Johnson Ranch North Subdivision

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.

Global Logistics Park

Posted on September 15th, 2020 by Renee Narvaez

Global Logistics Park is a master-planned distribution park located on the west side of Staten Island, New York. The park will contain nearly 4 million square feet of industrial buildings and related site infrastructure. Bowman provided survey layout services as the Surveyor-of-Record for the entire project.

Hanover Cross Roads Solar Field

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided engineering services to provide over 52,000 sq. ft. of roof top solar panels and 17,000 sq. ft. of ground-mounted solar panels to a new shopping center.

Grover Road Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided support under an active on-call multi-year agreement with the Anne Arundel County Department of Public Works. The project required final engineering and surveying for roadway widening, turn-lane construction and drainage improvements.

George Mason University Faculty and Staff Housing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and land surveying services to this multi-phased, design-build housing project that consisted of 422 total units, including 75 apartments, 105-unit townhomes, 164 urban townhomes, 58 duplex units and 20 small lot units.

Hamilton Safety Center

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and surveying services for this project, which included a 17,000 sq. ft. building with 6 attached bays for fire and rescue vehicles and a 5,400 sq. ft. annex building. A site plan was developed and processed through the Town of Hamilton and included design for stormwater, sanitary sewers, water, and stormwater management.