Costco, Boca Congress Center

Posted on September 1st, 2023 by Ji Lee

A traffic impact analysis was completed for the proposed amendment. The site included a 144,140 sq. ft. Costco warehouse, as well as a Costco gas station with 12 fueling positions. The amendment includes the addition of eight (8) additional fueling positions.

Cumberland Drive

Posted on September 1st, 2023 by Ji Lee

Our team redesigned Cumberland Drive between Military Trail and Village Boulevard to accommodate one-way, separated bicycle lanes using vertical delineators. The project also included design of a roundabout at the Saratoga Road intersection that accommodated separate bicycle and pedestrian crossing treatments. Efforts included agency coordination.

Hanover Tysons

Posted on August 31st, 2023 by Jillian Taylor

Bowman provided full-service engineering, environmental consulting, surveying and construction administration for a new seven-story residential building and structured parking deck in Tysons, VA.

Frying Pan Farm Park

Posted on August 31st, 2023 by Jillian Taylor

Frying Pan Farm Park is located in western Fairfax County and preserves and interprets a 1920’s through 1950’s farm, agricultural process, and rural community life. The farm serves as a landscape for educational, cultural and recreational enrichment for citizens and visitors of Fairfax County.

George Mason University Peterson Hall

Posted on August 31st, 2023 by Jillian Taylor

The Peterson Family Health Sciences Hall at George Mason University is the new home for the College of Health and Human Services that has advanced the university’s goal of setting new standards for design, sustainability, and wellness.

Harleville Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman geologists/hydrogeologists were responsible for the implementation of a groundwater investigation relative to a proposed quarry deepening.

Western New York Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman completed a drainage basin analysis and groundwater study to evaluate the impact mining would have on the regional watershed within the Adirondack Mountains.

Drainage Basin Analysis and Groundwater Study

Posted on August 25th, 2023 by Jillian Taylor

Bowman completed a drainage basin analysis and groundwater study to evaluate the impact mining would have on the regional watershed within the Adirondack Mountains.

New York Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman project hydrogeologists evaluated the deepening of a quarry that was located immediately adjacent to the Hudson River with a floor 200-ft below the river. A field investigation was developed, and an analysis was performed to evaluate the potential to deepen the quarry by an additional 100-ft.

Wetland Delineation-Groundwater Impact Assessment

Posted on August 25th, 2023 by Jillian Taylor

Bowman investigated the groundwater and surface water relationships for a proposed mining site, which included an upland wetland system and surface drainage within the drainage basin.