County Road 804

Posted on September 20th, 2020 by Renee Narvaez

Grand County, Winter Park Ranch Water and Sanitation District, and the Town of Fraser had a common interest in completing infrastructure improvements in County Road 804, including a new storm sewer system, a water main replacement, and improvements to the existing road surface and new road striping.

Central Tri-State Tollway Improvements

Posted on September 20th, 2020 by Renee Narvaez

Bowman was responsible for Phase I and Phase II design for the Open Road Tolling Program, roadway widening, bridge widening, and toll and interchange ramp modifications on the I-294 tollway. Bowman worked closely with Illinois Tollway during Phase I and Phase II.

Route 460 Corridor Improvement Project

Posted on September 20th, 2020 by Renee Narvaez

This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.

Tri-State Tollway (I-294) Reconstruction, Mile Long Bridge

Posted on September 15th, 2020 by Renee Narvaez

The Mile Long Bridge is a critical piece of infrastructure to the Central Tri-State Tollway (I-294) corridor as it carries drivers over two major railroads, three water sources and local roads, and over a major distribution center for UPS and Burlington Northern Santa Fe (BNSF) Railway. Bowman is providing Phase III construction management services for this multi-year project.

Terminal 5 – M Fuel Extension Fuel Package at O’Hare Airport

Posted on September 15th, 2020 by Renee Narvaez

Bowman is providing resident engineering services for this fuel loop being constructed in advance of the new International Terminal (T5) Building expansion.

Stearns Road

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided Phase II engineering services for the design of the New Stearns Road. Other roadways included in this project include McLean Boulevard and IL Route 31. Bowman’s staff prepared plans, specifications, and estimates for the construction of this new four-lane roadway.

Structural Engineering Services for 7 Structures

Posted on September 15th, 2020 by Renee Narvaez

Phase I and Phase II included engineering design services for the repair and maintenance of seven separate structures. Work included the determination of appropriate repair and maintenance activities for each structure based on recent Bridge Condition Reports, discussions with KDOT staff, and other improvements determined during Phase II engineering.

Portsmouth Bypass

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided overall design, design management, roadway and drainage design, hydrologic and hydraulic calculations, traffic engineering/management, electrical design, ITS, tolling systems, right-of-way and ATCs through Tender Phase.

Metra/US Route 45 Bridge

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided Phase II engineering design of a two-span steel through girder railroad bridge. The project included modifications to the geometry and configuration of the Metra Southwest Service Line Bridge including raising the bridge profile. The scope of services included the removal and replacement of the railroad bridge over US 45 and a separate pedestrian […]

Landmarker at Radburn

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning and civil design services to deliver this 12-acre residential redevelopment consisting of twelve, three-story buildings, providing a total of 165 residential units of with a portion allocated for affordable housing. Bowman was responsible for all preliminary and final site plans, prepared a boundary and topographic survey, and conducted a traffic impact study.