FDOT Traffic Operations Safety Studies

Posted on June 8th, 2022 by Renee Narvaez

As a consultant on this task order-based contract, the team performs work and is responsible for managing sub-consultant teams in the preparation and submittal of various types of traffic studies and assessments. This includes safety studies, qualitative assessments, signal warrant analyses, intersection analyses, arterial analyses, left‐turn phase warrant analyses, supplemental tasks and fatal crash reviews.  

City of Fort Myers Bicycle & Pedestrian Master Plan

Posted on June 8th, 2022 by Renee Narvaez

City of Fort Myers Bicycle & Pedestrian Master Plan is part of an ongoing general planning consulting contract for the Lee County MPO. Efforts included an extensive inventory of existing bicycle and pedestrian facilities, literature research, a needs assessment, agency coordination, and a robust public outreach process.

Parker County Transportation Bond Program

Posted on February 25th, 2022 by Renee Narvaez

As part of Parker County Transportation 2016 Bond Program, Bowman provided boundary, aerial, and topographic survey for approximately eight (8) miles of a prosed road (loop) around the City of Weatherford.

Bowman Springs Road

Posted on February 22nd, 2022 by Renee Narvaez

Provided design survey for the improvements and right-of-way acquisition for 6,000 LF of Bowman Springs Road. The team established control points and benchmarks at 1,000-foot intervals throughout the project site. Horizontal coordinates were obtained using GPS and vertical values were established by closed level loops from City of Arlington control monuments.

Moseby Drive

Posted on October 27th, 2020 by Renee Narvaez

A dual culvert under Moseby Drive in the City of Manassas Park, Virginia became compromised during a storm and collapsed. As a result, a townhouse community of over 400 residents became inaccessible to vehicle traffic and also severed the water and sanitary utilities. Bowman was called upon by the City to lead efforts to restore the vital connection.

FDOT District 4 Continuing Services

Posted on September 28th, 2020 by Renee Narvaez

Bowman is performing surveying, mapping and SUE services across Broward, Palm Beach, Martin, St. Lucie, and Indian River Counties. Under this program, our team helps to enhance and improve Florida’s roadways all while utilizing the latest standards in maintenance of traffic to ensure the safety of our team and the traveling public.

North Tarrant Express I-35W (Segment 3C)

Posted on September 25th, 2020 by Renee Narvaez

Bowman is part of a team providing design services and design management of the new I-30 Direct Connector, IH-820 DC at Mark IV Parkway and Segment 3C South Expressway. The scope includes roadway design, ITS and illumination, hydrologic/hydraulic analysis and traffic management and reconstruction of nine interchanges.

FM 2325

Posted on September 22nd, 2020 by Renee Narvaez

Bowman provided design and right of way services for roadway widening and turn-lane improvements to 3.1-miles of FM 2325 including design and right-of-way survey, right-of-way condemnation/donation assistance, environmental permitting, revised project schematic, preparation of construction plans, specifications and construction cost estimates.

FM 110

Posted on September 22nd, 2020 by Renee Narvaez

Bowman provided land surveying, right-of-way coordination, construction plans review, and QA/QC support for the design and construction of a portion of Farm to Market 110 (San Marcos Loop).

County Road 804

Posted on September 20th, 2020 by Renee Narvaez

Grand County, Winter Park Ranch Water and Sanitation District, and the Town of Fraser had a common interest in completing infrastructure improvements in County Road 804, including a new storm sewer system, a water main replacement, and improvements to the existing road surface and new road striping.