Landmarker at Radburn

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning and civil design services to deliver this 12-acre residential redevelopment consisting of twelve, three-story buildings, providing a total of 165 residential units of with a portion allocated for affordable housing. Bowman was responsible for all preliminary and final site plans, prepared a boundary and topographic survey, and conducted a traffic impact study.

ERM Solar City

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed various services for the proposed 1099 kW solar array: New Solar Field, 4 AC, Greenport, NY – surveying and site plan preparation including boundary survey research of 4 acres. Carnegie Center Solar Canopy Project, West Windsor, NJ – surveying and site plan preparation on 4 Sites.

Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Disaster Recovery Services Great Gorge Golf Course

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided disaster recovery services on behalf of York Risk Services Group to assess the physical and financial damage to Great Gorge Golf Course as a result of Hurricane Irene and Tropical Storm Lee. Bowman services consisted of assessing damage through analysis of on-site mapping before and after conditions and preparing a report and photo documentation of findings.

Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Bordentown Waterfront Community

Posted on September 15th, 2020 by Christina Nichols

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Cedar Crest Village

Posted on September 15th, 2020 by Renee Narvaez

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Avenue at South Orange

Posted on September 15th, 2020 by Renee Narvaez

This innovative transit oriented project consists of 79 residential units and ground floor retail. Bowman provided oversight and planning for the initial demolition of the building as well as site plan/design, land surveying, and coordination with adjacent supermarket, restaurant, and bank to create driveway access and sufficient parking for the property. Bowman also provided landscape architecture services, to include streetscape design.

Arbor Terrace

Posted on September 15th, 2020 by Renee Narvaez

Arbor Terrace provides 82 residential units for assisted living within a new three-story building and includes the construction of new internal paved access drives and parking areas throughout the site. Bowman provided civil engineering, surveying, permitting, and construction administration services.