Ellsworth Road

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided extensive planning, design, and construction support services to deliver a complicated expansion of major public infrastructure. The team worked closely with local residents, municipal bodies, and governing utility boards to ensure all stakeholders concerns were understood and addressed in the planning process.

CTC on Camelback

Posted on September 15th, 2020 by Renee Narvaez

This 14-acre site required a lot split and rezone which required extensive coordination between various local municipalities. Features 167 units of two-bedroom or duplex one-bedroom single story homes with high-end amenities and private backyards. Bowman provided planning, entitlements, site planning, preliminary and final engineering, and construction support services.

CTC at Country Place

Posted on September 15th, 2020 by Renee Narvaez

This 154 unit community sits on 13.6 acres and features one or two-bedroom single story homes with high-end amenities and private backyards. Bowman provided planning, entitlements, utility coordination, site planning, preliminary/final engineering, and construction support services.

CTC on Greenway

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, entitlement support, site planning, preliminary and final engineering, and construction support services for this 136 unit single-family rental community on 17.5 acres.

CTC on Marley Park

Posted on September 15th, 2020 by Renee Narvaez

Located in the prestigious Marley Park Community, this 173 unit, 14.7 acre development features two-bedroom or duplex one-bedroom single story homes with high-end amenities and private backyards. Bowman provided planning, entitlement support, site planning, preliminary and final engineering, and construction support services.

Crosspoint

Posted on September 15th, 2020 by Suede

Bowman was hired to ensure design compliance with previously designed but never constructed plans and coordinate tie-in and access to public infrastructure. In the process, the team optimized the layout to reduce grading requirements and provide a cost savings to the client.

Confidential Wash Settlers

Posted on September 15th, 2020 by editor@bowman

Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.

Confidential Stormwater Diversions and Culverts

Posted on September 15th, 2020 by editor@bowman

Bowman designed three stormwater diversions to protect a leach pad. These diversions required the engineering design of several structures including channels, levees, energy dissipation structures and box culverts. In conjunction with these designs, Bowman developed method specifications for compaction and a design for soil cement that utilized the material sourced from the channel excavation.

Confidential Early Mine Water Supply

Posted on September 15th, 2020 by editor@bowman

Bowman developed a water distribution plan to provide potable and construction water to thhis project. This included the design of wells, impoundments, booster stations, overland pipelines and storage facilities. The first stage of this system currently operates at 650 psi and transports water over 2 miles.

Confidential Conveyor Corridor

Posted on September 15th, 2020 by editor@bowman

A new leach pad is being developed to meet the needs of a new pit. A major earthwork project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork and new traffic underpass.