Calumet

Posted on September 15th, 2020 by Renee Narvaez

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.

Canton Car Wash

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided surveying, land planning, and engineering services. Given the unique nature of this car wash project it required an analysis of both automobile and pedestrian circulation patterns within the site to ensure safety of users and the public. This project took a highly visible, dilapidated and under-utilized piece of industrial real estate and transformed it into an attractive “green” commercial site.

Cast Iron Pipe Replacement Program

Posted on September 15th, 2020 by Renee Narvaez

Bowman was hired as a primary engineering consultant, and completed the design, engineering and permitting for 17 miles of pipeline replacement. The majority of the designs were in major metropolitan cities or urban areas, with significant construction conflicts of other underground utilities. Included in the designs were the tie-in details, by-pass details, complete bill of materials, and service connections.

Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.

Bordetown Waterfront Community

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Cedar Crest Village

Posted on September 15th, 2020 by Renee Narvaez

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.