Bloomfield College Residence Hall

Posted on September 15th, 2020 by Renee Narvaez

This project consisted of the design of a four-story, 83,000 sq. ft. residence hall centrally located on the campus of Bloomfield College. Bowman provided its core planning, surveying, and civil design services to facility the construction of a new campus multi-function area. The team’s role included land surveying, planning and feasibility studies, site plan development, preparation of construction documents, and construction administration and observation.

Bluestone to Sunoco Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, survey, and design services included pipeline and right-of-way design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous interstate highway, road and railroad crossings, creeks and wetlands.

Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.

Avenue at South Orange

Posted on September 15th, 2020 by Renee Narvaez

This innovative transit oriented project consists of 79 residential units and ground floor retail. Bowman provided oversight and planning for the initial demolition of the building as well as site plan/design, land surveying, and coordination with adjacent supermarket, restaurant, and bank to create driveway access and sufficient parking for the property. Bowman also provided landscape architecture services, to include streetscape design.

Ballie Trust Pipeline

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided its core planning, survey, and design services to deliver a pipeline expansion project on a very tight deadline. The team had to navigate environmental sensitive areas, state and federal permitting requirements, endangered animals, and changing landowner consents.

Ballpark Village

Posted on September 15th, 2020 by Renee Narvaez

A Planned Area Development was previously approved for the stadium, practice facilities and basic infrastructure, which are currently in operation. The remaining parcels of land surrounding the facilities remain vacant. Bowman provided engineering and surveying services to support a proposed land use change from intense office to medium- and high-density residential for 60 acres of property in the southern portion of the project.

Bastrop Co. Complex Fire Recovery Program

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided project management services which included direct administration and manage-ment of a significant portion of the Department of Housing and Urban Development’s Community De-velopment Block Group grant for Disaster Recovery awarded through the Texas General Land Office for the non-housing allocation of the CDBG-DR grant, in conjunction with an Emergency Watershed Protection grant from the Natural Resource Conservation Service.

BB&T

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for preparation of topographic survey, coordination with field crew, preparation of Special Use Permit (SUP) application and supporting documents including conceptual plans and exhibits for Plan Commission meeting and public hearing, preparation of construction documents including landscape plans, utilities coordination, coordination and obtainment of permit, and construction administration.