Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.

Bordetown Waterfront Community

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Cedar Crest Village

Posted on September 15th, 2020 by Renee Narvaez

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.

Avenue at South Orange

Posted on September 15th, 2020 by Renee Narvaez

This innovative transit oriented project consists of 79 residential units and ground floor retail. Bowman provided oversight and planning for the initial demolition of the building as well as site plan/design, land surveying, and coordination with adjacent supermarket, restaurant, and bank to create driveway access and sufficient parking for the property. Bowman also provided landscape architecture services, to include streetscape design.

Ballie Trust Pipeline

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided its core planning, survey, and design services to deliver a pipeline expansion project on a very tight deadline. The team had to navigate environmental sensitive areas, state and federal permitting requirements, endangered animals, and changing landowner consents.

Ballpark Village

Posted on September 15th, 2020 by Renee Narvaez

A Planned Area Development was previously approved for the stadium, practice facilities and basic infrastructure, which are currently in operation. The remaining parcels of land surrounding the facilities remain vacant. Bowman provided engineering and surveying services to support a proposed land use change from intense office to medium- and high-density residential for 60 acres of property in the southern portion of the project.