CBRNE APG Command HQ Buildings 5016 & 5046

Posted on July 10th, 2023 by editor@bowman

Bowman provided commissioning services for the 20th CBRNE HQ facility. Design included renovating existing buildings 5016 and 5046, totaling 94,472 sq. ft. and 92,006 sq. ft. to provide a command suite with offices, SCIF, arms room, operations center, conference rooms, file and functions of a standard command and control facility.

Peraton

Posted on July 3rd, 2023 by Amy Talton

Bowman performed the MEP engineering services for the 105,000 sq. ft. Reston Town Center office of Peraton. The project involves the design and construction administration for four floors of corporate office space, including five SCIF spaces totaling 8,000 sq. ft. The design modified the existing base building VAV system to meet the new tenant layout, and design new dedicated units to serve the new mission critical spaces.

Century Link Data Centers

Posted on October 26th, 2021 by Amy Talton

Bowman provided short circuit analysis, protection device coordination study, and arc flash analysis for three Century Link data centers in Virginia, Colorado and Washington. We provided appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in the data centers.

Cisco Offices & Lab

Posted on October 25th, 2021 by Suede

Bowman was responsible for the mechanical, electrical, and plumbing engineering services for the new 97,000 sq. ft. Cisco project located in Columbia, Maryland. The office project includes the design and construction administration of corporate office space and a 10,000 sq. ft. mission critical lab space.

Project Talon II Admin/Data Center

Posted on September 29th, 2020 by editor@bowman

Provided preliminary topographic and ALTA surveys, preparation and processing of the site plan through the city, design for permitting for the renovation of parking and loading dock facilities, storm drainage analysis and design, fire line plans, coordination with security consultant Aronson Security Group (ASG) for detailed security perimeter.

Confidential Arizona Data Center

Posted on September 29th, 2020 by Suede

The masterplan for the client facility will be looking at the entire campus, encompassing Buildings A, B and C, to utilize 50MW in Building A, 20MW in Building B, and 50MW in Building C. Scope includes preliminary meetings, surveys and investigations to determine if the site should be modernized and conceptual grading and utility design.

Western Suburb Data & Cloud Centers

Posted on September 29th, 2020 by Suede

Bowman provided engineering services for a 2-story data center expansion and a 2-story cloud center that includes a ring road, parking, stormwater management and utility extensions.

Northern Virginia Data Center Phases I-III

Posted on September 29th, 2020 by editor@bowman

Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by editor@bowman

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

America Online Campus

Posted on September 15th, 2020 by editor@bowman

Bowman was responsible for the design of a major portion of this 216-acre HQ campus and provided extensive records research; as-built surveys for sanitary sewer main and service line; storm sewer, water main, secondary service line; fiber optic duct bank; irrigation line; and gas main and secondary service line location surveys, as well as telecommunications; and primary and secondary service electric line surveys.