55th Street Reconstruction
Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.