Clifton Water/Wastewater Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.

Charles City County Annual Services Contract

Posted on September 15th, 2020 by Renee Narvaez

Bowman was selected to perform utility engineering services for various water and wastewater systems. Bowman is responsible for attending various meetings with County staff and Supervisors, regulatory officials and representatives from the funding agencies in pursuit of financing for the below identified projects, as well as attending public meetings.

Chessie’s Trail: Lee District Park

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, engineering, surveying, landscape architecture, and environmental consulting services within the 120-acre Lee District Park as part of the Family Recreation Area Spray Park and Accessible Tree House and Chessie Trail development. The accessible trails and tree house project had significant topographic and tree preservation challenges.

Clark’s Branch Bridge Riverbend Park

Posted on September 15th, 2020 by Christina Nichols

Bowman provided watershed analysis, preliminary and final engineering design, environmental investigation and permitting, surveying and construction documentation, for design and installation of the 90 foot span hiker/equestrian bridge span over the Clark’s Branch tributary.

Cedar Crest Village

Posted on September 15th, 2020 by Renee Narvaez

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Bruce Avenue Drainage Project

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, surveying and design services to the City of Colonial Heights for the Phase III and IV drainage and utility improvement plans of the Bruce Avenue Drainage Improvements project. This project included approximately 6,500 linear feet of city streets. The scope of the project included complete water, sanitary sewer and storm sewer replacement. The project also involved substantial excavation of the roadways within the ROW limits and rebuilding of new asphalt sections and curb and gutter.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.

Caldwell Park

Posted on September 15th, 2020 by Christina Nichols

Caldwell Park is a 120-acre mixed-use development that includes 115 single-family lots, 131 townhomes and 286 apartments, along with 200,000 sq. ft. of commercial space. Bowman provided its core planning, surveying and civil design services to deliver the project. The team was challenged to incorporate elements of retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.

Caliber Collision

Posted on September 15th, 2020 by Renee Narvaez

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

Calumet

Posted on September 15th, 2020 by Renee Narvaez

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.