CR 266

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided core planning, drainage design, land surveying and environmental services for roadway improvements to an additional 1.9-mile section of CR 266. The team worked closely with local and state officials to ensure planning and ultimate design met growth targets and municipal goals. The team also coordinated with utility companies for the extension and or relocation of service lines.

Disaster Recovery Services Great Gorge Golf Course

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided disaster recovery services on behalf of York Risk Services Group to assess the physical and financial damage to Great Gorge Golf Course as a result of Hurricane Irene and Tropical Storm Lee. Bowman services consisted of assessing damage through analysis of on-site mapping before and after conditions and preparing a report and photo documentation of findings.

Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Confidential Wash Settlers

Posted on September 15th, 2020 by Renee Narvaez

Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.

Confidential Early Mine Water Supply

Posted on September 15th, 2020 by Renee Narvaez

Bowman developed a water distribution plan to provide potable and construction water to thhis project. This included the design of wells, impoundments, booster stations, overland pipelines and storage facilities. The first stage of this system currently operates at 650 psi and transports water over 2 miles.

Charles City County Annual Services Contract

Posted on September 15th, 2020 by Renee Narvaez

Bowman was selected to perform utility engineering services for various water and wastewater systems. Bowman is responsible for attending various meetings with County staff and Supervisors, regulatory officials and representatives from the funding agencies in pursuit of financing for the below identified projects, as well as attending public meetings.

Confidential Conveyor Corridor

Posted on September 15th, 2020 by Renee Narvaez

A new leach pad is being developed to meet the needs of a new pit. A major earthwork project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork and new traffic underpass.

Chessie’s Trail: Lee District Park

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, engineering, surveying, landscape architecture, and environmental consulting services within the 120-acre Lee District Park as part of the Family Recreation Area Spray Park and Accessible Tree House and Chessie Trail development. The accessible trails and tree house project had significant topographic and tree preservation challenges.

Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Clark’s Branch Bridge Riverbend Park

Posted on September 15th, 2020 by Christina Nichols

Bowman provided watershed analysis, preliminary and final engineering design, environmental investigation and permitting, surveying and construction documentation, for design and installation of the 90 foot span hiker/equestrian bridge span over the Clark’s Branch tributary.