Port of Mobile

Posted on June 15th, 2026 by Christina Nichols

Bowman provided subsurface utility engineering and utility survey services for the Alabama State Port Authority (ASPA) at the Port of Mobile main docks, supporting planning and design for future port improvements across an approximately 24-acre waterfront area.

Port of Corpus Christi Truck Congestion Management

Posted on June 15th, 2026 by Christina Nichols

Bowman is leading a study for the Port of Corpus Christi Authority (PCCA) to identify and implement congestion management strategies for truck traffic serving port terminals during peak grain export operations. The project focuses on improving truck flow, operational predictability and safety along the primary port access corridor during the ADM grain season.

Gulf Intracoastal Waterway

Posted on June 15th, 2026 by Christina Nichols

Bowman was contracted by the Texas Department of Transportation (TxDOT) to document conditions, economic significance and opportunities for improvements along a 400-mile portion the Gulf Intracoastal Waterway (GIWW).

Port of Houston – Wharf 16

Posted on June 15th, 2026 by Christina Nichols

Bowman conducted a hydrographic survey utilizing multibeam echo sounding and side scan sonar technologies along cells one through 19 of the wharf’s cellular wall face. The survey aimed to validate recent structural repairs, identify any remaining defects and support the creation of as-built documentation.

Port of Houston – Barbours Cut Terminal

Posted on June 15th, 2026 by Christina Nichols

Bowman is providing planning and design services for the redevelopment of the West End Container Yard, a 140-acre effort to expand loaded container operations utilizing rubber tire gantry cranes. Our services include terminal planning, capacity upgrade schemes and traffic flow evaluations.

PhilaPort

Posted on June 1st, 2026 by Christina Nichols

Bowman has supported PhilaPort for 14 years across 40+ projects, including strategic planning, facility condition assessments, feasibility studies, capital project development, permitting and construction-phase support within an active port and across a diverse, multi-terminal capital program.

Redondo Fishing Pier

Posted on November 20th, 2025 by Christina Nichols

Bowman is providing design and construction management services to the City of Des Moines for the reconstruction of the Redondo Fishing Pier and associated public amenities. Originally constructed in 1980, the existing pier was closed in 2019 due to safety concerns and is now being completely rebuilt to meet modern structural and public use standards.

Redondo Boardwalk Emergency Repair

Posted on November 7th, 2024 by Ji Lee

Our team partnered with the City of Des Moines to restore the storm-damaged Redondo Boardwalk along Poverty Bay. Services included project management, structural engineering, environmental permitting, and construction oversight. Key repairs involved replacing girders, decking, and support elements, with FHWA funding accelerating timelines. The new design improves resilience, featuring concrete decking with wood-grain texture and UV-resistant coatings for longevity.

Spruce Street Harbor Park

Posted on April 17th, 2023 by Jillian Taylor

Our team provided marine engineering services for the construction of Spruce Street Harbor Park at Penn’s Landing in Philadelphia, PA. We provided mooring analysis, preliminary and final marine structural analysis and design, permitting and construction inspection services for this project.

Seawall Stabilization

Posted on March 15th, 2023 by Christina Nichols

Our team was hired to perform a combined multi-beam side scanning sonar and LiDAR investigation to produce 3-D digital model of the vertical surface of the Troy seawall above and below the water surface. This continuous model produced a high resolution “picture” of the wall.