On-Call GEC for Bus System Infrastructure Improvements

Posted on September 30th, 2024 by Renee Narvaez

Bowman was engaged by the MBTA for a four-year, $7M contract to plan, design and construct a wide range of bus system infrastructure projects to further upgrade and enhance bus system accessibility, safety, state of good repair, service reliability, travel times, and system wide expansion.

North Station to Seaport Bus Link

Posted on September 30th, 2024 by Renee Narvaez

The overarching goal of the North Station to Seaport Bus Link project is to improve transit connectivity across the Downtown core of the City of Boston to meet current and future transit demands.

Crystal Drive Streetscape Improvements

Posted on June 17th, 2024 by Renee Narvaez

As part of several distinct projects along the Crystal Drive corridor, Bowman prepared designs for the construction of streetscape improvements including multi-modal transit accommodations with protected bicycle lanes, urban landscaping, green stormwater infrastructure, street lights and infrastructure improvements.

Las Cruces I-25 Study Corridor

Posted on March 27th, 2024 by Renee Narvaez

Our role included subsurface utility engineering quality levels B, C and D along approximately seven miles of I-25 right-of-way from the Dona Ana Interchange south to Lohman Avenue, with an additional seven miles of densely populated utility corridors beneath several arterial roadways and interchanges.

Sterling Southeast

Posted on March 26th, 2024 by Renee Narvaez

This 4-span 265’-0” pre-stressed concrete inverted tee girder bridge was constructed over the North Fork Big Nemaha River. Our team performed topographic survey, hydraulic survey, roadway design, bridge design, construction inspection and administration.

Seward South

Posted on March 26th, 2024 by Renee Narvaez

This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, Nebraska. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.

Road P32

Posted on March 26th, 2024 by Renee Narvaez

Just 4 miles south of the proposed Blair South Bypass, our team designed two miles of grading, culverts, 9″ doweled concrete pavement and erosion control. This county funded project was built under the NDOT standard specifications.

Blue River Bridge

Posted on March 26th, 2024 by Renee Narvaez

In this urban bridge project spanned the Blue River in Crete, NE. Our team performed the survey, design and construction inspection and administration of two bridges, storm sewer, concrete paving, environmental monitoring, seeding and erosion control.

27th/Fairfield & West ‘O’ Street Bridge

Posted on March 26th, 2024 by editor@bowman

Our team designed and provided construction management and construction inspections services for this federally funded project let by the NDOT. This project consisted of rehabilitating two bridges over Salt Creek in Lincoln, NE. The 2 bridges, one on 27th street and the other on West ‘O’ Street required several repairs.

Naper South

Posted on March 26th, 2024 by Renee Narvaez

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years.