Fine Ore Cusher – 7B Conveyor Counterweight Evaluation

Posted on July 11th, 2024 by Jillian Taylor

The existing counterweight on the 7B conveyor had a winch system with inadequate lug connections and was rigged at an improper angle, which created structural integrity issues. Bowman prepared an economic trade-off study and general arrangements for counterweight lifting methods.

Secondary (fine) Ore Cusher-7C Dribble Chute and Platform

Posted on July 11th, 2024 by Jillian Taylor

The client was looking for a safer and more efficient way to transfer ore to the main course ore bin. Bowman produced general arrangements and mechanical drawings for the project.

Primary Crusher Belt Feeder – Motor Lifting Plan

Posted on July 11th, 2024 by Jillian Taylor

Project objective was to evaluate existing capacity of ceiling beams for trolley and hoist system designed to remove and install belt feeder motors to a roof opening area. Bowman provided a load rating and lifting plan for the belt feeder motors.

Thomas Jefferson’s Monticello

Posted on July 9th, 2024 by Jillian Taylor

Thomas Jefferson’s home, Monticello, was a working, 5,000-acre plantation that was home to Jefferson and hundreds of other people. In 2022, the Monticello archaeology team contracted our team to acquire 30 points per square meter (ppm) lidar of the original 5,000-acre to identify unseen traces of past agricultural land use.

Sierrita Mine Access Road Grading and Drainage Plan

Posted on July 3rd, 2024 by Jillian Taylor

Bowman provided engineering services for a construction drawing package for access road grading and drainage improvements. The haul roads were severely damage during storm events so collection, conveyance channels, sediment traps and culverts were designed to manage a 25-year, 24-hour storm event.

New SX Settlers Feasibility Engineering

Posted on July 3rd, 2024 by Jillian Taylor

Based on previous wash settler design experience, Bowman was uniquely qualified to do a feasibility study (FS) design for a new solvent extraction (SX) plant at a different operation for the Sierrita Mine. The project required a closely coordinated team of process, mechanical, civil, structural and electrical engineers.

Hayden AB-BC TSF Decant System

Posted on July 3rd, 2024 by Jillian Taylor

Bowman provided construction engineering services. Because of changes in the planned use of the AB-BC Tailings storage facility, the diameter of the slurry distribution pipes were reduced from 18” to 12”. This and other changes were implemented in the pump set ups. These changes resulted in overall improved decant system efficiency.

Harleville Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman geologists/hydrogeologists were responsible for the implementation of a groundwater investigation relative to a proposed quarry deepening.

Western New York Hydrogeologic Investigation

Posted on August 25th, 2023 by Jillian Taylor

Bowman completed a drainage basin analysis and groundwater study to evaluate the impact mining would have on the regional watershed within the Adirondack Mountains.

Drainage Basin Analysis and Groundwater Study

Posted on August 25th, 2023 by Jillian Taylor

Bowman completed a drainage basin analysis and groundwater study to evaluate the impact mining would have on the regional watershed within the Adirondack Mountains.