Sterling Southeast

Posted on March 26th, 2024 by Jillian Taylor

This 4-span 265’-0” pre-stressed concrete inverted tee girder bridge was constructed over the North Fork Big Nemaha River. Our team performed topographic survey, hydraulic survey, roadway design, bridge design, construction inspection and administration.

Seward South

Posted on March 26th, 2024 by Jillian Taylor

This 5 span, 180’-0” long bridge replacement project included a bridge over the Blue River on the south edge of Seward, Nebraska. This cast in-place concrete slab bridge was designed to handle the frequent flooding of the Blue River.

Road P32

Posted on March 26th, 2024 by Jillian Taylor

Just 4 miles south of the proposed Blair South Bypass, our team designed two miles of grading, culverts, 9″ doweled concrete pavement and erosion control. This county funded project was built under the NDOT standard specifications.

Blue River Bridge

Posted on March 26th, 2024 by Jillian Taylor

In this urban bridge project spanned the Blue River in Crete, NE. Our team performed the survey, design and construction inspection and administration of two bridges, storm sewer, concrete paving, environmental monitoring, seeding and erosion control.

27th/Fairfield & West ‘O’ Street Bridge

Posted on March 26th, 2024 by Jillian Taylor

Our team designed and provided construction management and construction inspections services for this federally funded project let by the NDOT. This project consisted of rehabilitating two bridges over Salt Creek in Lincoln, NE. The 2 bridges, one on 27th street and the other on West ‘O’ Street required several repairs.

Naper South

Posted on March 26th, 2024 by Jillian Taylor

Due to flood damage in March of 2019, our team was hired to design and oversee construction of this replacement bridge. This bridge was designed and constructed in 3 years.